Version 5.09 Verification 1 Trou Bufo Fret,602.65800,3062.51100,704.00,LT3 Club SCM Entree 0.0 Couleur 0,0,0 Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 0.0 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 N I * N ;entrée basse point coté; 0.0 1.1 3.78 114.00 -45.00 0.00 0.60 0.00 0.80 N I * N 1.1 1.2 1.98 44.00 -10.00 0.00 0.60 0.00 0.20 N I * N 1.2 1.3 2.26 80.00 -5.00 0.30 0.50 0.40 0.20 N I * N 1.3 1.4 6.70 105.00 7.00 3.00 0.80 0.00 1.50 N I * N ;point coté départ siphon; 1.4 1.5 6.66 118.00 23.00 0.80 1.00 0.50 0.60 N I * N 1.5 1.6 4.41 104.00 11.00 0.90 0.80 1.60 0.20 N I * N 1.6 1.7 4.86 48.00 32.30 1.00 0.30 0.40 1.20 N I * N 1.7 1.8 1.60 5.00 25.00 0.80 0.90 0.20 1.00 N I * N 1.8 1.9 7.78 43.00 26.00 0.40 0.60 0.20 1.20 N I * N 1.9 1.10 5.35 36.00 5.00 0.20 1.10 0.30 1.30 N I * N 1.10 1.11 4.88 74.00 -37.30 0.20 0.60 1.00 0.10 N I * N 1.11 1.12 4.48 57.00 -1.00 0.40 0.80 0.40 1.20 N I * N 1.12 1.13 2.84 82.00 5.00 0.40 0.40 0.30 0.80 N I * N 1.13 1.14 3.77 41.00 10.30 0.10 1.00 0.30 1.00 N I * N 1.14 1.15 3.82 61.00 -26.00 0.35 0.80 1.00 0.50 N I * N 1.15 1.16 2.68 17.00 12.00 1.80 1.10 1.00 1.30 N I * N ;point coté départ aval; 1.16 1.17 3.17 44.00 -7.00 0.30 0.50 0.40 1.20 N I * N 1.17 1.18 5.88 116.00 -7.00 0.30 0.20 1.30 0.30 N I * N 1.18 1.19 2.96 129.00 6.00 1.30 1.60 2.00 1.00 N I * N 1.19 1.20 2.55 94.00 5.00 1.80 0.40 2.00 1.30 N I * N 1.20 1.21 12.83 57.00 0.00 1.80 2.00 3.50 1.00 N I * N 1.21 1.22 14.90 87.00 -2.30 1.70 1.00 1.80 0.20 N I * N 1.22 1.23 6.01 45.00 7.30 0.30 1.70 2.30 1.20 N I * N 1.23 1.24 8.21 57.00 -5.00 2.10 0.40 4.00 0.10 N I * N 1.24 1.25 12.30 28.00 11.00 0.80 2.50 2.50 1.40 N I * N ;point coté shunt 1ère escalade; 1.25 1.26 7.11 67.30 12.00 2.00 0.40 0.90 1.30 N I * N 1.26 1.27 3.96 12.00 2.30 0.80 2.00 7.00 1.30 N I * N 1.27 1.28 13.25 85.00 55.00 0.20 1.50 5.00 1.50 N I * N 1.28 1.29 5.77 109.00 84.00 0.00 3.00 2.00 0.00 N I * N 1.29 1.30 2.84 72.00 29.00 2.50 1.00 2.00 0.30 N I * N ;point coté haut du P 17; 1.30 1.31 9.52 9.00 39.30 1.80 1.50 4.00 0.80 N I * N 1.31 1.32 14.50 46.00 31.00 2.00 0.60 1.70 1.30 N I * N 1.32 1.33 17.30 26.00 11.30 1.50 1.50 1.30 1.00 N I * N 1.33 1.34 4.92 347.00 8.00 0.00 3.00 6.00 1.40 N I * N 1.34 1.35 8.10 32.00 36.00 0.20 2.60 1.00 1.50 N I * N 1.35 1.36 6.33 110.00 14.30 2.00 3.00 4.60 0.00 N I * N 1.36 1.37 4.60 0.00 90.00 1.40 0.40 0.30 4.60 N I * N 1.37 1.38 5.17 307.00 13.00 0.00 1.80 1.20 1.00 N I * N ;point coté haut 3ème corde; 1.38 1.39 5.07 344.00 7.00 0.80 1.40 3.00 0.70 N I * N 1.39 1.40 2.64 335.00 50.00 0.70 2.40 0.90 1.30 N I * N 1.40 1.41 14.06 0.00 -15.00 1.20 1.00 0.80 0.50 N I * N 1.41 1.42 9.00 22.00 -6.00 0.40 1.50 1.50 0.00 N I * N 1.42 1.43 8.93 49.00 37.00 0.30 1.80 1.00 1.20 N I * N ;point coté ressaut de l'échelle; 1.43 1.44 4.30 54.00 12.00 0.20 1.00 0.60 1.50 N I * N 1.44 1.45 4.21 27.00 6.00 0.30 1.40 1.30 5.00 N I * N 1.45 1.46 5.57 4.00 -25.00 0.20 0.30 0.60 0.00 N I * N 1.46 1.47 5.89 39.00 34.00 0.90 0.50 1.20 0.30 N I * N ;point coté concrétion; 1.47 1.48 4.70 18.00 0.00 0.70 0.50 0.70 0.80 N I * N 1.48 1.49 6.61 18.00 33.00 0.00 0.60 0.80 1.40 N I * N 1.49 1.50 2.32 29.00 -12.00 0.70 0.00 0.60 0.50 N I * N 1.50 1.51 2.90 2.30 20.00 0.50 0.60 0.60 1.00 N I * N 1.51 1.52 2.35 37.00 6.00 0.70 0.30 1.30 1.00 N I * N 1.52 1.53 13.40 6.00 -23.30 1.00 1.60 2.00 1.50 N I * N 1.53 1.54 4.41 50.00 4.00 0.50 0.10 0.30 2.30 N I * N 1.54 1.55 2.30 359.00 -10.00 3.00 1.00 2.50 0.30 N I * N 1.55 1.56 9.09 21.00 -13.00 2.00 1.20 0.50 1.30 N I * N 1.56 1.57 8.24 26.00 2.00 3.00 2.50 4.00 1.20 N I * N ;point coté salle de la jonction (carrefour); Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 1.57 3.1 1.30 53.00 36.00 3.00 2.30 2.50 2.00 N I * N ;départ galerie du sable; 3.1 3.2 8.18 320.30 10.00 0.70 2.40 3.00 0.00 N I * N 3.2 3.3 7.05 257.00 26.00 3.00 0.00 1.30 1.40 N I * N 3.3 3.4 14.71 275.00 -1.00 2.00 0.40 1.70 1.30 N I * N ;point coté escalade concrétionnée; 3.4 3.5 9.91 273.00 -14.00 2.00 1.80 2.50 0.20 N I * N 3.5 3.6 4.92 262.00 3.00 2.00 1.00 2.00 0.20 N I * N 3.6 3.7 6.20 334.00 -13.30 0.80 1.00 0.20 0.50 N I * N 3.7 3.8 2.69 329.00 -27.00 0.70 0.30 0.30 0.00 N I * N 3.8 3.9 7.47 247.00 -1.00 1.60 1.00 0.70 0.10 N I * N 3.9 3.10 5.33 247.00 4.00 1.50 0.90 0.60 0.30 N I * N 3.10 3.11 13.73 230.00 -1.00 0.90 1.30 0.40 0.40 N I * N Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 1.57 2.1 12.15 217.00 41.00 4.00 0.40 3.00 1.60 N I * N 2.1 2.2 13.91 82.00 55.00 2.40 0.80 1.60 0.90 N I * N 2.2 2.3 5.22 33.00 3.00 1.30 1.80 1.80 1.20 N I * N 2.3 2.4 12.43 23.00 -18.00 1.60 0.90 1.60 0.90 N I * N 2.4 2.5 14.50 12.00 1.30 2.20 1.50 1.40 1.30 N I * N 2.5 2.6 12.42 8.00 -9.00 1.20 2.00 2.20 1.10 N I * N 2.6 2.7 10.47 31.00 10.30 2.50 0.90 1.50 1.40 N I * N 2.7 2.8 11.03 53.00 28.00 2.00 1.00 1.50 2.00 N I * N 2.8 2.9 10.41 355.00 -17.00 1.80 0.80 2.00 1.50 N I * N 2.9 2.10 1.58 116.00 19.00 2.50 2.00 1.70 0.40 N I * N ;point coté départ vallée blanche; 2.10 2.11 8.25 312.00 -39.30 0.40 2.00 1.50 1.00 N I * N 2.11 2.12 8.00 22.00 -13.00 0.40 0.90 2.00 1.90 N I * N 2.12 2.13 4.05 66.00 8.00 1.00 0.70 1.50 2.40 N I * N 2.13 2.14 5.04 10.00 -12.00 0.30 2.80 7.00 1.50 N I * N ;point coté "bonnet"; 2.14 2.15 4.94 81.00 53.00 0.50 0.00 0.80 1.50 N I * N 2.15 2.16 3.59 82.00 5.00 1.80 0.50 6.00 1.60 N I * N 2.16 2.17 4.08 353.00 38.00 1.50 1.00 2.00 0.60 N I * N 2.17 2.18 9.60 2.00 -12.00 0.90 0.70 1.00 1.30 N I * N ;point coté avant "dromadaire"; 2.18 2.19 4.75 21.00 1.00 0.80 0.30 1.30 1.40 N I * N 2.19 2.20 3.52 25.00 1.30 0.40 0.20 4.00 1.40 N I * N 2.20 2.21 3.33 356.00 18.00 0.70 1.00 0.50 2.70 N I * N 2.21 2.22 4.60 35.00 14.00 1.50 1.50 2.00 2.40 N I * N 2.22 2.23 3.57 114.00 33.00 0.40 0.80 3.00 1.50 N I * N ;point coté ressaut de la fenêtre (ressaut Stoche); 2.23 2.24 2.36 67.00 36.30 0.30 0.90 0.80 4.00 N I * N ;point coté fenêtre; 2.24 2.25 10.37 16.00 -8.00 2.50 1.50 1.80 0.80 N I * N ;point coté concrétion "rouille à Bès"; 2.25 2.26 19.17 356.00 -3.30 2.50 1.70 2.50 1.10 N I * N 2.26 2.27 10.66 359.00 14.00 2.80 1.70 3.00 0.50 N I * N 2.27 2.28 2.16 308.00 25.00 1.30 3.00 2.00 1.00 N I * N ;point concrétion accès Riu Fret; 2.28 2.29 15.58 26.00 27.30 0.20 1.50 1.20 0.50 N I * N 2.29 2.30 10.00 22.30 21.00 1.50 2.50 1.70 0.70 N I * N ;point coté concrétion accès trou souffleur de la boue; 2.30 2.31 15.09 29.00 15.00 4.00 1.00 1.30 1.20 N I * N 2.31 2.32 17.89 53.30 16.00 1.70 1.00 1.00 4.00 N I * N 2.32 2.33 3.14 41.00 10.00 1.50 0.40 1.30 4.00 N I * N 2.33 2.34 7.27 348.00 -10.30 1.30 0.90 1.00 0.80 N I * N 2.34 2.35 8.75 21.00 -8.00 0.70 1.80 0.70 1.70 N I * N 2.35 2.36 6.30 66.00 -10.00 0.40 1.50 5.00 4.00 N I * N 2.36 2.37 4.65 42.00 -10.00 0.60 0.70 6.00 2.80 N I * N 2.37 2.38 3.42 95.00 4.00 1.00 0.60 5.00 3.00 N I * N 2.38 2.39 6.38 25.00 -15.00 0.00 0.80 5.00 1.00 N I * N ;point coté haut du ressaut à Pupu; 2.39 2.40 12.13 22.00 -24.00 1.10 3.50 3.00 1.30 N I * N 2.40 2.41 18.93 45.00 16.00 2.00 1.50 2.00 0.20 N I * N 2.41 2.42 15.68 16.00 0.30 3.00 1.50 1.50 1.00 N I * N ;point coté avant le puits broyé; 2.42 2.43 11.66 347.30 -32.00 0.00 5.00 3.00 2.00 N I * N ;point coté haut du puits broyé; 2.43 2.44 15.37 36.00 -27.50 0.10 3.00 2.50 1.50 N I * N 2.44 2.45 10.06 60.00 11.30 5.00 1.50 2.00 0.50 N I * N 2.45 2.46 7.71 355.00 5.00 3.00 0.80 1.50 3.00 N I * N ;point coté accès amont Riu Fret; 2.46 2.47 17.40 333.00 -3.00 0.50 4.00 1.30 1.10 N I * N 2.47 2.48 19.07 4.00 4.00 1.30 2.00 1.30 0.20 N I * N 2.48 2.49 5.61 28.00 12.00 1.80 2.00 2.00 0.40 N I * N ;point coté bas de la coulée glissante; 2.49 2.50 17.98 43.30 35.00 1.80 0.40 0.70 1.00 N I * N 2.50 2.51 9.23 19.00 14.30 0.90 1.00 0.70 1.50 N I * N ;point coté haut de la coulée glissante; 2.51 2.52 4.10 26.00 0.30 0.30 1.00 0.60 1.30 N I * N 2.52 2.53 14.70 355.00 -18.30 1.60 3.50 2.50 0.60 N I * N 2.53 2.54 4.92 303.00 -10.00 0.90 1.50 0.50 0.40 N I * N ;point coté; 2.54 2.55 6.08 359.00 4.00 1.60 3.00 3.00 0.50 N I * N 2.55 2.56 7.74 73.00 10.00 0.10 3.30 1.20 1.10 N I * N 2.56 2.57 6.99 130.00 -4.00 1.60 1.60 1.60 0.90 N I * N 2.57 2.58 4.79 198.00 -2.30 3.00 1.80 3.50 0.40 N I * N 2.58 2.59 8.69 173.00 27.00 1.50 0.40 1.50 1.40 N I * N 2.59 2.60 13.32 168.00 -7.00 0.60 1.10 4.00 2.00 N I * N 2.60 2.61 7.45 150.30 18.30 0.80 0.50 3.50 3.00 N I * N 2.61 2.62 4.87 150.00 -19.00 1.00 0.80 2.50 1.50 N I * N 2.62 2.63 5.43 104.00 -1.00 1.50 0.80 2.00 10.00 N I * N 2.63 2.64 6.20 135.00 -6.00 1.50 0.30 3.00 8.00 N I * N ;point coté début méandre; 2.64 2.65 5.82 60.00 -27.00 0.40 0.30 7.00 6.00 N I * N 2.65 2.66 3.61 113.00 -18.00 0.50 0.90 6.00 4.00 N I * N 2.66 2.67 6.23 218.00 22.00 0.30 0.50 5.00 5.00 N I * N 2.67 2.68 3.97 160.00 42.00 0.40 0.60 0.40 2.00 N I * N 2.68 2.69 8.55 142.00 -5.00 1.20 0.80 2.50 1.00 N I * N 2.69 2.70 5.63 110.00 2.00 0.50 1.00 1.00 10.00 N I * N 2.70 2.71 3.32 72.00 -7.00 0.60 0.80 2.50 0.00 N I * N 2.71 2.72 10.40 46.00 -2.30 0.00 1.00 3.00 10.00 N I * N ;point coté; 2.72 2.73 10.41 79.00 -9.30 1.60 1.20 2.00 1.50 N I * N 2.73 2.74 3.89 353.30 -23.00 0.30 0.50 6.00 8.00 N I * N 2.74 2.75 2.77 71.00 -23.00 0.40 1.00 6.00 6.00 N I * N 2.75 2.76 2.32 359.00 -14.30 0.00 0.40 4.00 4.00 N I * N 2.76 2.77 1.58 28.00 15.00 0.30 0.30 4.00 5.00 N I * N 2.77 2.78 3.60 3.00 -45.00 0.40 0.00 0.60 3.00 N I * N 2.78 2.79 4.63 33.00 -6.00 0.10 0.30 5.00 1.75 N I * N 2.79 2.80 3.24 11.00 -19.00 0.25 0.30 10.00 1.70 N I * N ;point coté perte de l'actif; Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 3.11 3.12 2.93 264.00 -17.00 0.70 1.00 0.40 0.25 N I * N 3.12 3.13 4.03 298.00 -22.30 0.60 0.00 0.30 0.15 N I * N 3.13 3.14 3.35 247.00 -3.00 1.00 0.30 0.20 0.15 N I * N 3.14 3.15 2.36 221.00 9.00 1.00 1.00 0.20 0.10 N I * N 3.15 3.16 5.93 228.00 8.00 1.00 1.50 0.60 1.00 N I * N 3.16 3.17 3.19 278.00 -16.00 1.80 0.70 0.60 0.60 N I * N 3.17 3.18 8.47 319.00 -26.30 0.70 0.40 0.30 0.00 N I * N 3.18 3.19 2.95 7.00 -20.00 0.40 1.30 0.20 0.15 N I * N 3.19 3.20 2.08 356.00 -26.00 0.10 0.70 0.25 0.00 N I * N 3.20 3.21 5.84 1.00 3.00 0.50 0.60 0.40 0.20 N I * N 3.21 3.22 3.95 14.00 13.30 2.00 0.60 0.80 0.60 N I * N 3.22 3.23 9.47 284.00 -2.00 1.50 1.00 1.60 0.10 N I * N 3.23 3.24 11.25 264.00 10.00 1.60 2.10 3.00 0.50 N I * N 3.24 3.25 2.93 323.00 17.30 1.50 1.50 3.00 0.70 N I * N 3.25 3.26 7.34 300.00 -7.00 0.30 0.40 1.50 0.50 N I * N 3.26 3.27 6.45 293.30 -10.00 1.60 0.00 1.00 0.10 N I * N 3.27 3.28 7.89 295.30 6.00 1.00 1.20 0.80 0.90 N I * N 3.28 3.29 9.45 276.00 -7.00 0.50 1.30 2.50 0.20 N I * N 3.29 3.30 14.64 300.00 -7.30 2.00 1.30 1.70 0.80 N I * N 3.30 3.31 5.85 298.00 -4.30 2.60 0.40 1.80 0.50 N I * N 3.31 3.32 15.02 273.00 -20.00 1.80 1.30 2.20 0.50 N I * N 3.32 3.33 6.21 274.00 -12.00 2.30 1.00 3.50 0.60 N I * N 3.33 3.34 5.25 245.30 6.00 0.80 3.00 8.00 1.30 N I * N ;point coté "arche"; 3.33 14.1 2.63 153.00 7.00 0.10 0.10 2.50 1.50 N I * N ;point coté pissotière; 3.34 15.1 8.68 270.00 21.00 0.60 2.00 4.00 1.00 N I * N Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 2.80 2.81 2.89 50.00 -8.00 0.00 0.50 8.00 2.00 N I * N Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 2.81 2.82 3.96 125.00 7.00 0.50 0.30 8.00 2.00 N I * N 2.82 2.83 2.59 100.00 1.50 0.00 0.50 6.00 2.00 N I * N 2.83 2.84 1.52 129.00 -9.00 0.00 0.60 6.00 1.50 N I * N 2.84 2.85 3.47 48.00 -2.30 0.40 0.20 6.00 1.50 N I * N 2.85 2.86 0.66 358.00 -2.00 0.00 0.40 6.00 1.50 N I * N 2.86 2.87 3.80 71.00 -4.30 0.50 0.30 5.50 1.00 N I * N 2.87 2.88 3.05 5.00 4.00 0.70 0.20 8.00 1.20 N I * N 2.88 2.89 6.24 33.00 0.30 0.40 0.30 8.00 1.20 N I * N 2.89 2.90 2.64 107.00 -5.30 0.40 0.30 8.00 0.80 N I * N 2.90 2.91 1.99 36.00 7.30 0.40 0.50 8.00 1.20 N I * N 2.91 2.92 2.57 55.00 7.00 0.20 0.40 8.00 1.50 N I * N 2.92 2.93 1.75 338.00 -2.30 0.00 0.40 9.00 1.40 N I * N 2.93 2.94 1.38 51.00 -1.00 0.30 0.20 8.00 1.50 N I * N 2.94 2.95 1.68 102.00 -1.00 0.30 0.00 8.00 1.30 N I * N 2.95 2.96 2.30 52.30 -4.00 0.30 0.15 8.00 1.00 N I * N 2.96 2.97 1.02 347.00 17.30 0.20 0.00 8.00 1.40 N I * N 2.97 2.98 0.66 16.00 3.00 0.30 0.00 8.00 1.40 N I * N 2.98 2.99 1.53 73.00 10.00 0.40 0.30 8.00 1.70 N I * N 2.99 2.100 4.01 13.00 1.00 0.30 0.60 9.00 1.70 N I * N ;point coté méandre; 2.100 2.101 2.15 108.00 -4.00 0.70 0.30 8.00 1.50 N I * N 2.101 2.102 3.38 126.00 0.00 0.30 0.15 10.00 1.50 N I * N 2.102 2.103 1.59 81.00 6.00 0.40 0.25 8.00 1.70 N I * N 2.103 2.104 3.13 126.00 35.00 1.20 0.60 9.00 3.00 N I * N 2.104 2.105 3.57 75.00 11.00 0.50 0.20 10.00 4.00 N I * N 2.105 2.106 2.67 92.00 -19.00 1.10 0.70 1.50 1.60 N I * N 2.106 2.107 2.99 157.00 20.00 0.70 0.00 4.00 2.00 N I * N 2.107 2.108 4.33 107.00 42.00 0.50 0.60 7.00 4.50 N I * N Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 2.108 2.109 6.50 138.00 -22.00 2.00 1.20 6.00 1.30 N I * N 2.109 2.110 5.69 97.00 16.30 0.00 3.00 3.00 0.90 N I * N ;point coté bas escalade du Mikado; 2.110 2.111 2.59 126.30 -2.00 0.30 2.00 1.70 1.40 N I * N 2.111 2.112 1.63 92.00 -47.00 1.40 0.30 0.15 0.25 N I * N 2.112 2.113 6.24 63.30 -24.00 3.00 1.10 0.50 0.40 N I * N 2.113 2.114 4.93 80.00 1.30 3.00 1.00 2.00 1.00 N I * N 2.114 2.115 4.78 100.30 5.00 1.50 4.00 1.50 0.50 N I * N ;point coté sable; 2.115 2.116 4.88 95.00 30.00 1.50 1.50 2.50 1.00 N I * N 2.116 2.117 14.37 145.00 10.30 1.10 1.30 1.50 1.00 N I * N ;point coté départ actif; 2.117 2.118 13.00 157.00 0.50 2.40 1.70 3.00 1.00 N I * N 2.118 2.119 5.42 86.00 22.00 2.00 2.00 0.80 2.70 N I * N 2.119 2.120 6.23 102.00 18.30 1.30 0.80 0.00 0.60 N I * N 2.120 2.121 8.42 143.00 12.00 1.20 1.50 1.50 1.00 N I * N 2.121 2.122 4.01 162.00 -28.00 1.00 1.50 1.20 0.20 N I * N 2.122 2.123 8.93 151.00 5.30 1.00 1.50 0.30 0.50 N I * N 2.123 16.1 1.30 54.00 10.00 * * * * N I * N ;point coté; 2.123 2.124 19.60 124.00 -2.30 2.00 3.50 1.70 1.00 N I * N 2.124 2.125 3.03 75.00 -9.30 1.80 1.50 2.00 0.50 N I * N ;point coté; 2.125 2.126 4.27 145.00 -3.00 0.50 0.70 1.20 0.70 N I * N 2.126 2.127 4.03 123.00 -3.00 1.30 0.50 1.20 2.20 N I * N 2.127 2.128 6.42 73.00 -6.00 0.00 1.80 1.50 1.00 N I * N 2.128 2.129 3.16 157.00 9.30 0.60 1.40 0.50 0.90 N I * N 2.129 2.130 2.33 133.00 -15.00 1.20 1.40 1.60 1.50 N I * N 2.130 2.131 2.71 104.00 25.00 0.40 0.30 0.60 0.40 N I * N 2.131 2.132 1.65 123.00 -5.00 0.40 0.20 1.00 1.60 N I * N 2.132 2.133 2.03 73.30 -38.30 0.10 0.50 0.50 1.50 N I * N 2.133 2.134 1.60 36.00 -6.00 0.00 0.40 0.50 0.10 N I * N 2.134 2.135 3.49 130.00 49.30 1.00 4.00 3.00 0.60 N I * N 2.135 17.1 8.51 305.00 30.00 1.50 2.00 1.60 0.80 N I * N 17.1 17.2 5.59 342.30 37.00 0.80 1.40 0.00 1.00 N I * N ;point coté trémie supérieure; 2.135 2.136 8.78 112.00 3.00 1.50 1.80 1.00 0.70 N I * N 2.136 2.137 4.02 69.00 8.00 3.00 2.30 2.00 1.00 N I * N ;point coté arrivée d'eau; 2.137 2.138 6.31 26.00 35.00 0.20 1.50 0.30 1.50 N I * N 2.138 2.139 5.10 46.00 4.00 1.30 0.80 0.60 0.00 N I * N 2.139 2.140 1.87 21.00 19.30 0.60 0.10 0.00 0.60 N I * N ;point coté terminal; Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 1.38 19.1 1.64 134.00 -4.30 0.00 1.80 1.20 1.00 N I * N 19.1 19.2 7.04 128.00 -18.30 5.00 2.50 3.00 0.00 N I * N 19.2 19.3 7.55 25.30 30.30 3.00 1.50 2.00 0.00 N I * N 19.3 19.4 3.48 39.00 14.00 0.70 1.30 0.50 0.40 N I * N 19.4 19.5 3.06 32.00 -13.00 0.20 1.60 0.60 0.60 N I * N 19.5 19.6 2.28 30.00 11.00 0.15 0.60 0.30 0.00 N I * N 19.6 19.7 1.30 10.00 27.00 0.60 0.70 0.80 0.00 N I * N 19.7 19.8 5.96 8.00 49.00 0.70 1.50 0.60 2.00 N I * N 19.8 19.9 1.10 51.00 28.00 0.40 1.60 1.00 1.20 N I * N 19.9 19.10 3.60 335.00 27.00 1.10 0.80 0.60 0.75 N I * N 19.10 19.11 5.16 48.00 19.00 0.00 1.30 0.80 1.30 N I * N 19.11 19.12 7.76 28.00 27.30 0.60 1.60 0.90 0.50 N I * N 19.12 19.13 7.57 38.00 10.00 0.30 1.50 0.80 0.40 N I * N 19.13 19.14 2.33 17.00 8.00 0.80 1.00 0.40 0.60 N I * N 19.14 19.15 2.83 20.00 -8.30 0.70 0.20 0.00 0.20 N I * N Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 3.34 4.1 9.77 303.30 51.30 1.80 3.00 3.50 0.80 N I * N 4.1 4.2 8.55 273.00 0.00 2.30 1.70 1.50 0.60 N I * N 4.2 4.3 16.35 244.00 0.30 1.10 3.00 0.30 0.90 N I * N 4.3 4.4 3.47 274.00 -23.30 0.60 1.70 0.70 0.35 N I * N 4.4 4.5 5.55 298.00 -28.00 0.10 0.30 0.40 0.00 N I * N 4.5 4.6 3.14 290.00 9.30 0.70 1.00 0.50 0.20 N I * N 4.6 4.7 2.71 233.00 7.00 2.60 0.60 0.50 0.55 N I * N 4.7 4.8 14.03 187.00 24.30 3.70 1.80 4.00 1.10 N I * N 4.8 4.9 5.70 278.00 37.00 1.30 1.90 1.00 1.10 N I * N 4.9 4.10 3.00 325.30 -9.00 1.70 0.80 0.90 0.60 N I * N 4.10 4.11 13.77 277.00 9.00 1.00 2.30 1.20 1.30 N I * N 4.11 4.12 14.16 299.00 4.00 0.50 2.00 1.50 0.80 N I * N 4.12 4.13 14.65 303.00 13.00 0.90 3.00 1.70 1.10 N I * N 4.13 4.14 17.90 295.00 5.00 2.00 0.80 1.20 0.60 N I * N 4.14 4.15 11.57 288.00 -1.30 1.10 1.80 1.80 0.20 N I * N 4.15 4.16 8.14 309.00 4.00 1.00 1.25 0.90 0.70 N I * N ;point coté début dernier boyau; 4.16 4.17 6.27 312.00 -10.00 1.00 1.30 0.50 0.60 N I * N 4.17 4.18 2.49 218.00 -28.00 0.50 0.00 0.30 0.10 N I * N 4.18 4.19 5.00 193.00 12.00 1.40 1.60 1.10 0.10 N I * N 4.19 4.20 2.79 286.00 25.00 2.20 1.20 0.90 0.60 N I * N 4.20 4.21 12.11 320.00 17.00 3.50 1.00 2.50 4.00 N I * N 4.21 4.22 4.69 259.00 28.00 4.00 0.40 3.00 0.60 N I * N ;point coté salle; 4.22 4.23 8.19 230.00 43.30 4.00 10.00 0.30 0.30 N I * N 4.23 4.24 3.80 240.00 49.00 1.80 3.00 3.00 1.40 N I * N 4.24 4.25 3.33 188.00 27.30 0.00 2.00 1.30 1.10 N I * N ;point coté départ shunt; 4.25 4.26 9.85 219.00 19.00 1.50 1.50 4.50 0.80 N I * N 4.26 4.27 4.37 46.00 59.00 2.20 0.30 4.00 1.30 N I * N 4.27 4.28 9.57 14.30 34.00 1.00 0.40 6.00 0.50 N I * N 4.28 4.29 7.70 357.00 67.00 0.40 1.30 6.00 1.40 N I * N 4.29 4.30 10.76 5.00 35.00 0.00 1.40 10.00 2.00 N I * N ;point coté bas corde; 4.30 4.31 9.25 187.00 70.00 0.00 1.10 1.00 1.30 N I * N 4.31 4.32 5.11 225.00 33.00 2.00 1.00 2.20 0.40 N I * N 4.32 4.33 10.79 141.00 34.30 1.20 0.40 1.20 0.50 N I * N 4.33 4.34 0.76 70.00 17.00 0.80 1.50 0.30 1.20 N I * N ;point coté haut escalade; 4.34 4.35 4.75 205.00 30.30 1.00 0.00 0.40 0.00 N I * N 4.17 20.1 1.95 344.30 21.00 1.00 0.00 1.30 0.80 N I * N ;point coté à la fumée - départ méandre; 4.30 21.1 5.59 17.30 19.00 0.00 0.40 8.00 1.50 N I * N 21.1 21.2 4.14 14.00 -34.00 0.25 0.40 10.00 0.80 N I * N 21.2 21.3 5.44 19.30 12.00 0.40 0.20 10.00 1.00 N I * N 21.3 21.4 3.17 1.00 41.00 1.30 0.40 10.00 2.00 N I * N 21.4 21.5 7.75 20.00 26.30 0.80 0.60 10.00 1.10 N I * N 21.5 21.6 3.45 97.00 1.00 1.30 0.40 0.40 0.60 N I * N 21.6 21.7 3.34 31.00 10.00 1.00 0.70 0.20 0.80 N I * N 21.7 21.8 3.47 70.00 23.00 0.00 1.00 1.00 0.70 N I * N 21.8 21.9 2.67 115.00 5.00 1.00 0.40 0.50 0.60 N I * N 21.9 21.10 3.94 68.00 -8.00 0.30 0.20 0.50 0.00 N I * N 21.10 21.11 1.45 117.00 56.00 0.60 0.40 1.00 1.60 N I * N 21.11 21.12 3.75 36.00 10.00 0.50 0.20 1.30 0.20 N I * N 21.12 21.13 2.35 4.30 -63.00 0.60 0.20 1.20 0.30 N I * N ;point coté fond du méandre - trou souffleur; 21.13 21.14 1.88 220.00 -21.00 0.40 0.20 0.30 0.10 N I * N Param Deca Deg Clino Deg -1.1119 Dir,Dir,Dir Inc Std --/--/---- M 1.25 22.1 3.50 140.00 10.30 0.45 0.30 6.00 1.70 N I * N ;départ shunt P 17; 22.1 22.2 3.86 116.00 64.00 0.35 0.20 10.00 1.05 N I * N 22.2 22.3 10.37 89.00 63.00 0.30 0.90 1.50 0.70 N I * N 22.3 22.4 3.23 31.00 18.30 0.80 1.20 0.50 0.40 N I * N 22.4 22.5 8.50 58.00 -5.00 1.00 0.30 2.00 0.00 N I * N 22.5 22.6 5.96 339.00 70.00 1.60 1.00 1.00 0.90 N I * N 22.6 22.7 3.63 326.30 1.00 0.40 2.80 1.20 0.90 N I * N 22.7 22.8 2.04 90.00 6.00 * * * * N I * N ;jonction haut P 17 (point 1.30); Param Deca Deg Clino Deg -1.1119 Dir,Dir,Dir Inc Std --/--/---- M 1.38 23.1 5.34 315.00 32.30 1.00 1.40 1.00 0.80 N I * N 23.1 23.2 5.83 188.00 35.30 1.20 0.50 0.90 1.80 N I * N 23.2 23.3 3.16 185.00 42.00 0.50 0.30 0.00 0.50 N I * N 23.3 23.4 2.43 167.00 14.00 0.60 0.65 0.80 0.40 N I * N 23.4 23.5 1.76 246.00 56.00 0.00 0.30 2.00 1.20 N I * N 23.5 23.6 2.93 199.00 53.30 0.40 0.30 0.40 0.50 N I * N 23.6 23.7 1.46 213.00 -9.00 0.20 0.50 0.35 0.70 N I * N 23.7 23.8 1.40 250.00 24.30 0.30 0.50 0.50 1.00 N I * N 23.8 23.9 2.52 189.00 54.00 0.90 0.60 0.75 0.90 N I * N 23.9 23.10 2.83 163.00 7.30 0.60 0.90 1.20 1.70 N I * N 23.10 23.11 1.75 170.00 42.00 0.50 1.00 0.25 0.30 N I * N 23.11 23.12 4.10 109.00 16.00 1.70 1.00 1.00 0.20 N I * N 23.12 23.13 3.35 116.00 50.00 0.90 0.40 1.00 0.80 N I * N 23.13 23.14 6.26 216.00 55.00 0.10 0.45 0.60 0.20 N I * N ;point coté haut escalade; 23.14 23.15 4.03 18.00 12.30 0.40 0.20 1.00 0.00 N I * N 23.15 23.16 2.10 274.00 64.00 0.40 0.30 0.40 0.80 N I * N 23.16 23.17 1.77 299.00 35.00 1.00 0.60 0.60 0.80 N I * N 23.17 23.18 3.82 357.30 25.00 0.80 1.20 1.20 0.50 N I * N 23.18 23.19 0.51 276.00 38.00 0.35 1.40 0.90 0.10 N I * N ;point coté départ annexe; 23.19 23.20 3.43 33.00 38.00 0.45 0.80 0.50 0.90 N I * N 23.20 23.21 10.49 341.00 3.30 1.15 0.00 0.20 0.60 N I * N 23.21 23.22 1.10 286.30 28.00 1.00 0.70 0.50 0.90 N I * N 23.22 23.23 3.51 30.00 -13.00 0.20 0.90 0.30 0.00 N I * N 23.23 23.24 2.73 29.00 24.00 1.00 0.55 0.60 0.70 N I * N 23.24 23.25 2.69 311.00 -11.00 0.60 1.10 0.75 0.60 N I * N 23.25 23.26 0.97 6.30 -34.00 0.70 0.80 0.85 0.65 N I * N 23.26 23.27 4.88 342.00 -7.00 0.40 0.85 1.00 0.20 N I * N 23.27 23.28 1.73 26.00 11.00 0.90 1.00 0.70 0.65 N I * N 23.28 23.29 6.48 354.00 -21.00 1.00 0.50 0.60 0.00 N I * N 23.29 23.30 3.59 352.00 6.00 1.15 0.25 0.40 0.50 N I * N 23.30 23.31 0.26 122.00 2.00 1.40 0.00 0.40 0.50 N I * N ;point coté étroiture avec de la flotte; 23.31 23.32 2.84 323.00 -14.00 1.30 0.00 0.52 0.45 N I * N 23.32 23.33 3.21 8.00 14.00 1.10 0.20 2.45 0.15 N I * N 23.33 23.34 1.91 352.00 68.00 0.10 0.68 3.07 1.34 N I * N 23.34 23.35 6.10 60.00 -12.30 0.45 0.60 0.60 0.85 N I * N 23.19 24.1 5.51 187.00 20.30 0.70 1.10 1.60 1.50 N I * N ;départ annexe; 24.1 24.2 1.55 222.00 4.00 0.40 1.00 0.70 0.60 N I * N 24.2 24.3 5.00 203.00 -25.00 0.50 0.20 0.50 0.00 N I * N 24.3 24.4 2.00 190.00 0.00 0.20 0.00 0.20 0.00 N I * N 24.1 25.1 4.81 267.00 43.00 0.70 0.60 1.00 0.40 N I * N 25.1 25.2 1.41 2.00 67.00 1.10 0.60 1.60 0.70 N I * N 25.2 25.3 0.35 147.00 62.00 1.00 1.00 1.00 1.10 N I * N 25.3 25.4 4.75 171.00 25.30 0.60 0.65 0.60 0.40 N I * N 25.4 25.5 4.53 209.00 -17.00 0.20 0.50 1.00 0.50 N I * N 25.5 25.6 4.68 201.00 -33.30 0.00 0.30 0.40 0.30 N I * N ;point coté; 23.14 26.1 2.26 202.00 -7.30 0.60 0.10 0.70 1.30 N I * N 26.1 26.2 1.32 215.00 -18.00 0.20 0.20 1.00 1.50 N I * N 26.2 26.3 2.64 200.00 -2.30 0.45 0.45 0.55 0.85 N I * N 26.3 26.4 3.92 207.00 25.30 0.40 0.30 1.00 0.20 N I * N 26.4 26.5 7.50 192.30 -2.00 0.00 0.40 0.30 0.40 N I * N Param Deca Deg Clino Deg -1.0635 Dir,Dir,Dir Inc Std --/--/---- M 1.16 5.1 4.31 47.00 -22.00 0.80 0.30 0.40 0.10 N I * N 5.1 5.2 2.95 329.00 13.00 0.65 2.30 1.00 0.45 N I * N 5.2 5.3 10.20 273.00 -1.30 2.60 1.80 1.70 2.00 N I * N 5.3 5.4 9.14 266.00 -32.00 4.00 2.50 2.00 0.80 N I * N 5.4 5.5 2.97 292.00 -11.00 1.80 0.50 1.00 1.20 N I * N 5.5 5.6 6.24 237.00 9.30 1.00 0.60 1.20 0.90 N I * N 5.6 5.7 3.72 259.00 -34.00 0.40 0.20 2.00 0.00 N I * N 5.4 6.1 5.60 171.00 -17.00 0.60 0.20 0.50 0.00 N I * N 6.1 6.2 2.05 92.00 9.00 0.30 0.20 0.10 0.60 N I * N 6.2 6.3 1.02 107.00 34.00 0.50 0.20 0.50 0.50 N I * N 6.3 6.4 1.76 220.00 19.00 0.30 0.30 1.00 0.40 N I * N 6.4 6.5 1.95 242.00 -8.00 0.30 0.30 1.40 0.70 N I * N 6.5 6.6 1.28 187.00 3.00 0.40 0.40 0.70 0.20 N I * N 6.6 6.7 4.10 192.00 -55.00 0.40 0.20 0.60 0.00 N I * N 6.7 6.8 2.00 217.00 0.00 0.60 0.40 1.30 0.00 N I * N Param Deca Deg Clino Deg -1.1119 Dir,Dir,Dir Inc Std --/--/---- M 1.57 7.1 15.08 204.00 39.00 1.50 1.10 1.10 0.80 N I * N 7.1 7.2 7.50 185.00 25.00 1.00 1.00 2.00 1.00 N I * N ;point coté; 7.2 7.3 7.80 215.00 13.00 1.00 4.00 0.50 0.20 N I * N 7.3 7.4 3.03 316.00 21.30 1.50 1.00 0.50 1.60 N I * N 7.4 7.5 4.16 225.00 25.00 1.50 0.50 1.00 0.80 N I * N 7.5 7.6 8.80 191.00 39.00 0.70 1.00 0.40 1.30 N I * N 7.6 7.7 11.67 144.00 33.30 2.00 3.00 2.00 1.30 N I * N 7.7 7.8 9.02 221.00 38.00 6.00 2.00 1.20 1.00 N I * N 7.8 7.9 3.79 191.00 28.00 0.75 2.00 1.30 1.00 N I * N 7.9 7.10 10.55 183.00 49.00 0.50 1.70 1.20 1.00 N I * N 7.10 7.11 1.54 92.00 26.00 0.20 2.00 0.60 0.50 N I * N 7.11 7.12 3.22 121.00 11.30 0.80 2.00 1.10 0.20 N I * N 7.12 7.13 4.58 127.00 62.30 1.20 1.00 1.00 0.80 N I * N 7.13 7.14 4.52 172.00 54.00 0.80 0.40 0.70 0.90 N I * N 7.14 7.15 8.20 229.00 13.00 0.80 3.00 3.00 1.50 N I * N ;point coté haut escalade; 7.9 8.1 10.78 297.00 -41.00 4.00 1.00 1.00 0.00 N I * N Param Deca Deg Clino Deg -1.1119 Dir,Dir,Dir Inc Std --/--/---- M 2.10 9.1 4.70 113.00 37.00 0.80 1.10 0.80 1.20 N I * N 9.1 9.2 2.25 55.00 47.30 0.50 0.70 1.20 1.00 N I * N 9.2 9.3 5.90 359.00 -12.00 0.35 1.10 0.60 0.50 N I * N 9.3 9.4 8.62 26.00 6.00 1.30 0.00 0.50 4.00 N I * N ;point coté; 9.4 9.5 4.26 341.00 -28.30 1.30 1.10 2.00 1.00 N I * N 9.5 9.6 16.79 3.30 -17.00 0.70 0.50 0.80 1.20 N I * N ;raccord au point 2.18; 9.3 10.1 2.23 25.00 -8.00 0.80 0.60 1.00 7.50 N I * N 10.1 10.2 7.50 0.00 -90.00 0.00 1.80 8.50 0.00 N I * N 9.4 11.1 4.68 59.00 45.00 0.90 0.00 0.40 1.60 N I * N 11.1 11.2 3.29 348.00 9.00 0.40 0.40 0.40 0.20 N I * N 11.2 11.3 2.18 267.00 55.00 0.40 1.00 1.40 0.20 N I * N 11.3 11.4 4.70 30.00 48.00 0.20 0.60 0.80 0.50 N I * N 11.4 11.5 2.62 128.30 48.00 0.20 0.30 0.70 0.60 N I * N 11.5 11.6 1.75 104.00 -43.00 1.00 0.10 0.30 0.10 N I * N 11.6 11.7 1.55 2.00 22.00 0.60 0.40 1.00 0.60 N I * N 11.7 11.8 5.21 27.00 0.00 0.80 0.20 0.80 0.00 N I * N 11.8 11.9 3.33 14.00 20.30 1.30 0.60 0.40 0.90 N I * N 11.9 11.10 6.05 26.00 -56.30 0.80 0.70 0.00 1.00 N I * N 11.10 11.11 2.69 223.30 -32.00 1.00 1.00 1.00 1.00 N I * N 11.11 11.12 8.23 340.00 -25.00 0.70 0.80 2.00 4.00 N I * N 11.12 11.13 10.99 317.00 -18.30 2.40 3.00 4.00 0.60 N I * N 11.13 11.14 4.71 143.00 -2.00 0.90 1.20 1.50 0.60 N I * N 11.14 11.15 3.27 83.30 -21.00 0.60 1.70 1.00 0.40 N I * N 11.15 11.16 7.75 188.00 8.00 1.40 1.30 2.00 0.70 N I * N 11.16 11.17 8.80 206.00 -28.00 1.40 2.80 3.00 0.40 N I * N 11.17 11.18 6.05 355.30 -7.00 0.70 0.50 0.80 1.20 N I * N ;raccord avec le point 2.18; 2.10 12.1 8.25 309.00 -39.00 0.40 1.80 1.30 1.00 N I * N 12.1 12.2 4.27 34.00 2.00 0.80 1.20 0.60 1.10 N I * N 12.2 12.3 5.03 108.00 8.00 0.80 0.60 2.20 0.60 N I * N 12.3 12.4 3.99 148.00 -7.30 0.70 1.30 0.90 0.10 N I * N 12.4 12.5 3.65 19.00 26.00 0.00 0.80 0.00 1.40 N I * N ;bas de puits - raccord avec le point 10.2; 12.5 12.6 5.00 19.30 -15.00 0.30 0.50 4.00 0.00 N I * N Param Deca Deg Clino Deg -1.1119 Dir,Dir,Dir Inc Std --/--/---- M 2.10 13.1 16.17 285.00 -4.00 0.60 1.10 4.00 1.00 N I * N ;départ vallée blanche; 13.1 13.2 9.40 294.00 37.00 2.00 1.30 4.00 0.70 N I * N 13.2 13.3 3.50 265.00 -2.00 0.40 0.50 7.00 1.30 N I * N 13.3 13.4 7.85 281.00 6.00 0.30 0.50 10.00 1.00 N I * N 13.4 13.5 4.22 320.00 22.00 0.20 0.50 4.00 4.00 N I * N 13.5 13.6 9.00 331.00 -5.00 1.00 0.50 3.00 3.00 N I * N 13.6 13.7 7.90 306.00 -11.00 1.50 1.30 10.00 0.80 N I * N ;point coté; 13.7 13.8 12.75 323.30 39.30 1.50 2.50 4.00 1.00 N I * N 13.8 13.9 14.81 317.00 40.00 1.00 1.30 2.50 1.00 N I * N 13.9 13.10 6.01 316.00 -19.00 0.40 1.10 1.50 1.20 N I * N 13.10 13.11 3.69 336.00 23.30 0.30 0.90 2.00 1.30 N I * N 13.11 13.12 7.85 342.00 7.00 0.30 0.80 3.00 1.10 N I * N 13.12 13.13 5.42 340.00 1.00 0.60 0.80 2.30 0.70 N I * N ;point coté bas escalade; 13.13 13.14 1.75 351.00 7.00 0.00 1.20 3.00 2.00 N I * N 13.14 13.15 7.43 5.00 -45.00 0.50 0.00 10.00 3.00 N I * N 13.15 13.16 5.67 355.00 -15.30 0.40 0.10 0.60 0.10 N I * N 13.16 13.17 3.11 320.00 0.00 0.50 0.00 0.20 0.20 N I * N ;point coté sommet P 10; 13.17 13.18 10.30 0.00 -90.00 0.80 1.50 20.00 0.00 N I * N Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 2.28 27.1 4.60 8.30 0.00 * * * * N I * N 27.1 27.2 9.03 9.00 -11.00 0.80 1.50 5.00 2.00 N I * N 27.2 27.3 1.56 339.00 2.30 0.40 0.70 2.00 3.00 N I * N 27.3 27.4 4.60 25.00 -6.00 0.40 0.30 5.00 2.50 N I * N 27.4 27.5 9.33 18.00 6.00 1.20 0.70 5.00 4.50 N I * N ;point coté départ en hauteur; 27.5 27.6 6.39 306.00 -17.00 1.50 0.60 5.00 1.10 N I * N 27.6 27.7 1.61 252.00 -12.00 0.20 1.00 5.00 0.80 N I * N 27.7 27.8 8.06 342.00 -2.00 0.15 0.80 5.00 0.60 N I * N 27.8 27.9 4.39 22.00 39.30 0.20 4.00 3.00 4.00 N I * N Param Deca Deg Clino Deg -1.1711 Dir,Dir,Dir Inc Std --/--/---- M 27.9 27.10 7.85 52.00 -12.00 0.00 2.50 5.00 2.00 N I * N ;point coté perte "actif"; 27.10 27.11 3.67 118.00 -4.00 0.20 1.00 6.00 1.60 N I * N 27.11 27.12 5.09 149.30 -6.00 0.30 1.00 5.00 1.00 N I * N 27.12 27.13 7.49 39.00 23.00 0.40 0.30 4.00 3.80 N I * N 27.13 27.14 7.31 32.00 -7.30 0.50 0.90 5.00 4.00 N I * N 27.14 27.15 6.25 53.00 1.00 0.60 1.20 6.00 2.50 N I * N 27.15 27.16 11.62 161.00 1.00 1.00 2.00 4.00 2.00 N I * N ;point coté départ en hauteur; 27.16 27.17 2.45 160.00 -4.00 1.20 0.00 4.00 2.00 N I * N 27.17 27.18 5.91 44.00 6.00 1.20 0.45 3.00 3.50 N I * N 27.18 27.19 3.37 80.00 -11.00 0.70 1.30 4.00 2.50 N I * N 27.19 27.20 0.99 57.00 -4.00 0.40 1.30 4.00 2.50 N I * N 27.20 27.21 2.61 35.00 2.00 0.60 0.70 4.00 2.20 N I * N 27.21 27.22 11.05 3.00 -2.30 0.10 0.60 5.00 2.00 N I * N 27.22 27.23 1.90 18.00 -18.00 0.50 0.80 3.00 1.20 N I * N 27.23 27.24 2.89 352.30 32.00 0.30 0.80 3.00 2.20 N I * N 27.24 27.25 1.95 27.30 12.30 0.70 1.10 2.50 2.50 N I * N 27.25 27.26 2.45 320.00 1.00 0.30 0.60 2.50 2.50 N I * N 27.26 27.27 5.00 12.00 -17.00 0.50 0.40 1.40 1.20 N I * N 27.27 27.28 7.64 41.00 14.30 1.00 0.20 1.00 3.00 N I * N 27.28 27.29 4.45 61.00 -5.00 0.80 2.00 0.70 2.60 N I * N 27.29 27.30 5.36 12.00 8.00 0.50 0.50 0.50 4.00 N I * N ;point coté étroiture; 27.30 27.31 5.47 39.00 -4.00 0.60 0.60 1.00 3.00 N I * N 27.31 27.32 8.23 353.00 -2.00 1.00 0.80 1.50 2.50 N I * N 27.32 27.33 6.83 20.00 -1.00 0.70 1.50 1.20 2.50 N I * N 27.33 27.34 2.04 352.00 -0.30 0.70 2.00 1.50 2.50 N I * N 27.34 27.35 6.24 26.00 3.00 0.40 1.30 1.00 2.50 N I * N ;point coté départ jonction puits broyé...; 27.35 27.36 3.42 132.00 -18.00 0.00 0.70 3.00 1.50 N I * N 27.36 27.37 2.33 136.00 0.00 0.40 0.30 3.00 1.50 N I * N 27.37 27.38 2.90 199.00 -5.30 0.30 0.10 3.50 1.30 N I * N 27.38 27.39 2.04 114.00 12.00 0.80 0.10 3.00 1.50 N I * N 27.39 27.40 3.60 62.00 5.30 0.70 0.40 3.50 1.50 N I * N 27.40 27.41 7.01 4.00 0.00 0.30 1.50 2.50 1.30 N I * N ;point coté siphon; 27.41 27.42 2.67 75.00 -5.00 0.20 0.30 0.30 1.26 N I * N 27.42 27.43 1.26 0.00 -90.00 * * * * N I * N 27.43 27.44 5.00 99.00 0.00 0.30 0.90 0.40 0.00 N I * N ;siphon; 27.41 28.1 3.98 49.30 41.30 1.30 0.70 0.90 0.70 N I * N 28.1 28.2 3.60 359.00 17.00 0.00 2.50 0.00 1.20 N I * N ;annexe siphon; Param Deca Deg Clino Deg -1.0635 Dir,Dir,Dir Inc Std --/--/---- M 3.4 29.1 3.73 260.00 -18.00 1.00 2.00 5.00 1.00 N I * N 29.1 29.2 8.80 326.00 66.00 0.30 0.40 1.00 1.50 N I * N ;Haut escalade accès galerie concrétionnée; 29.2 29.3 3.51 310.00 -0.30 0.50 0.50 2.00 0.70 N I * N 29.3 29.4 3.63 272.00 10.00 0.70 0.40 0.80 1.80 N I * N 29.4 29.5 1.36 288.00 -52.30 0.30 0.30 2.00 1.00 N I * N 29.5 29.6 2.73 327.30 -28.30 0.40 0.15 2.00 1.00 N I * N 29.6 29.7 6.73 313.00 -2.00 0.40 0.80 0.70 1.00 N I * N 29.7 29.8 3.26 331.00 -17.30 0.50 0.60 2.00 1.00 N I * N 29.8 29.9 4.44 309.30 -22.00 0.30 0.80 0.40 0.60 N I * N 29.9 29.10 3.83 301.00 21.00 0.20 0.70 3.50 1.00 N I * N 29.10 29.11 7.61 331.00 4.00 0.80 1.00 1.00 0.20 N I * N 29.11 29.12 8.44 278.00 14.00 0.80 0.70 1.00 0.50 N I * N 29.11 30.1 9.00 118.30 51.00 0.30 0.30 1.00 1.00 N I * N Param Deca Deg Clino Deg -1.0635 Dir,Dir,Dir Inc Std --/--/---- M 2.24 31.1 5.09 31.00 4.00 3.50 1.00 1.50 1.00 N I * N ;Escalade de Bernard Bru; 31.1 31.2 18.82 143.00 38.30 3.00 2.50 3.00 0.50 N I * N 31.2 31.3 11.35 141.00 52.30 3.00 1.00 1.00 0.70 N I * N 31.3 31.4 2.22 180.00 22.00 1.50 1.80 1.20 0.70 N I * N 31.4 31.5 7.95 222.00 -46.00 0.70 1.70 6.00 0.70 N I * N 31.5 31.6 1.99 327.00 18.00 0.70 0.00 2.00 1.30 N I * N 31.6 31.7 4.59 207.00 10.00 0.30 0.30 0.50 1.50 N I * N 31.7 31.8 8.08 190.00 5.00 0.20 0.50 3.50 4.00 N I * N 31.8 31.9 6.83 206.30 -23.00 1.00 2.00 1.20 0.70 N I * N 31.9 31.10 3.90 224.00 2.30 1.00 1.50 1.50 0.60 N I * N 31.10 31.11 13.83 208.00 -14.00 2.50 1.50 2.00 0.60 N I * N 31.11 31.12 6.80 199.00 -7.30 0.30 0.30 0.30 0.00 N I * N Param Deca Deg Clino Deg -1.0635 Dir,Dir,Dir Inc Std --/--/---- M 2.8 32.1 13.14 191.00 4.00 3.00 2.00 2.00 0.50 N I * N ;Accès galerie des 3000; 32.1 32.2 2.92 233.00 2.30 0.40 0.00 0.10 0.50 N I * N 32.2 32.3 6.29 153.00 2.00 1.50 2.00 2.00 0.50 N I * N 32.3 32.4 11.37 173.00 18.00 2.00 2.50 1.70 1.00 N I * N 32.4 32.5 5.81 100.00 30.00 2.00 2.00 4.00 1.00 N I * N 32.5 32.6 10.47 23.00 21.30 1.20 1.50 1.00 1.00 N I * N 32.6 32.7 5.54 23.30 11.00 1.50 1.50 1.50 1.00 N I * N 32.7 32.8 12.67 13.00 3.30 3.50 0.00 0.50 1.00 N I * N ;pt coté fond galerie des 3000; 2.64 33.1 0.69 300.00 -31.00 0.20 1.60 6.00 15.00 N I * N ;accès méandre inférieur; 33.1 33.2 7.13 246.00 -69.30 0.00 0.40 12.00 2.00 N I * N 33.2 33.3 5.03 77.00 -26.00 1.20 0.70 13.00 6.00 N I * N 33.3 33.4 4.07 236.00 -43.00 1.10 0.30 4.00 2.50 N I * N 33.4 33.5 1.58 283.30 -23.00 0.70 0.50 3.00 1.50 N I * N 33.5 33.6 3.60 313.00 -7.00 0.90 1.00 1.50 2.00 N I * N 33.6 33.7 6.12 347.00 24.00 5.00 0.50 4.00 3.00 N I * N 33.7 33.8 7.32 283.30 7.30 1.50 1.50 3.00 1.00 N I * N 33.8 33.9 8.78 344.30 -2.00 1.40 0.70 3.00 3.00 N I * N 33.9 33.10 4.99 334.00 -2.00 0.50 1.20 2.00 0.40 N I * N 33.10 33.11 2.22 3.30 1.00 0.40 0.70 4.00 3.00 N I * N 33.11 33.12 5.00 7.00 0.00 0.70 0.40 4.00 2.00 N I * N 33.12 33.13 8.20 336.00 0.00 0.20 1.60 4.00 1.00 N I * N ;pt coté; 33.13 33.14 4.07 23.00 12.00 1.50 2.00 2.00 1.00 N I * N 33.14 33.15 4.39 47.00 -15.00 1.50 1.40 1.50 1.00 N I * N 33.15 33.16 12.09 314.00 1.00 1.00 2.20 1.70 0.60 N I * N ;pt coté bord du P5; 33.16 33.17 4.50 283.00 13.00 1.30 1.80 1.50 3.00 N I * N ;autre coté P5; 33.17 33.18 1.67 299.00 2.00 0.60 0.40 1.70 2.00 N I * N 33.18 33.19 6.09 333.00 10.30 2.70 0.30 1.00 3.00 N I * N 33.19 33.20 8.71 190.00 -5.30 2.00 0.80 2.00 0.60 N I * N 33.20 33.21 10.54 181.30 -16.00 0.00 2.50 0.30 1.00 N I * N 33.21 33.22 4.84 199.30 -20.00 1.30 1.00 1.00 0.70 N I * N 33.22 33.23 6.33 175.00 -23.00 1.10 1.80 1.00 1.00 N I * N 33.23 33.24 7.10 177.00 5.00 4.00 2.00 2.00 1.00 N I * N 33.24 33.25 10.45 166.00 46.00 4.00 1.00 1.00 1.50 N I * N ;raccord avec 36.2; 33.24 34.1 4.66 206.30 -26.00 1.00 1.00 0.60 0.60 N I * N ;accès actif; 34.1 34.2 3.78 217.00 -3.00 0.80 0.00 0.20 0.40 N I * N 33.25 35.1 9.38 42.00 16.00 1.50 1.00 1.00 0.70 N I * N 35.1 35.2 5.87 340.30 7.00 0.50 0.80 0.15 0.35 N I * N 35.2 35.3 3.27 18.00 8.00 1.00 0.00 0.70 0.30 N I * N 35.3 35.4 6.22 352.00 4.00 * * * * N I * N ;raccord pt 2.54; 2.49 36.1 5.48 33.00 35.00 2.50 2.50 0.50 0.70 N I * N 36.1 36.2 15.91 5.00 -0.30 4.00 1.00 1.00 1.50 N I * N ;raccord avec 33.25; 2.49 37.1 6.81 349.30 2.00 0.80 0.40 0.80 0.40 N I * N 37.1 37.2 12.85 19.00 3.00 0.50 0.20 0.50 1.00 N I * N 37.2 37.3 2.33 56.00 53.30 * * * * N I * N ;raccord avec 36.2; 2.42 38.1 8.70 197.00 -1.00 * * * * N I * N ;départ escalade puits broyé; 38.1 38.2 9.67 354.00 55.00 * * * * N I * N 38.2 38.3 5.60 140.00 86.00 1.30 0.00 2.00 10.00 N I * N 38.3 38.4 4.60 176.00 39.30 0.90 0.30 7.00 1.30 N I * N 38.4 38.5 6.30 121.00 73.00 0.00 1.00 0.20 1.30 N I * N 38.5 38.6 4.85 183.00 -4.30 0.80 1.00 1.80 1.40 N I * N 38.6 38.7 11.69 134.30 0.00 0.00 0.80 0.80 1.00 N I * N 38.7 38.8 4.22 176.00 13.30 1.00 0.00 1.50 3.50 N I * N 38.8 38.9 7.26 137.00 -21.30 0.50 0.70 2.00 2.50 N I * N 38.9 38.10 2.53 146.30 -19.30 0.20 0.70 1.50 1.00 N I * N 38.10 38.11 3.66 134.00 -15.00 0.80 0.75 0.96 0.00 N I * N 38.11 38.12 2.29 92.00 13.00 0.40 0.30 0.20 0.40 N I * N 38.12 38.13 2.00 25.00 22.00 0.00 0.90 0.25 0.80 N I * N 38.13 38.14 1.61 95.00 39.30 0.85 0.80 0.00 0.78 N I * N 38.14 38.15 6.10 146.00 22.00 0.90 0.20 0.40 0.35 N I * N 38.15 38.16 3.68 42.00 24.00 0.75 1.17 2.12 1.33 N I * N 38.16 38.17 2.60 101.00 56.00 0.83 0.20 0.64 1.53 N I * N 38.17 38.18 3.91 51.00 11.00 0.60 1.50 1.00 0.97 N I * N 38.18 38.19 2.56 353.00 5.30 0.20 0.95 4.00 0.78 N I * N 38.19 38.20 3.44 51.00 49.00 1.40 0.60 2.20 1.30 N I * N ;fond escalade puits broyé; 38.6 39.1 13.00 0.00 90.00 2.00 3.50 0.00 14.00 N I * N ;haut cheminée; 1.47 40.1 4.78 215.00 -49.00 0.80 0.40 1.30 1.00 N I * N ;point coté concrétion; 40.1 40.2 4.10 198.00 11.00 1.17 1.89 1.17 1.16 N I * N 40.2 40.3 2.76 281.00 24.00 0.70 1.90 0.20 0.90 N I * N 40.3 40.4 2.03 316.00 0.00 0.70 0.70 0.80 0.90 N I * N 40.4 40.5 7.03 41.00 2.00 0.20 0.80 0.90 1.00 N I * N 40.5 40.6 2.12 81.00 -37.00 0.60 1.11 1.15 2.40 N I * N 40.6 40.7 3.66 50.00 10.00 0.80 0.45 0.70 0.20 N I * N 40.7 40.8 3.29 43.00 -11.00 1.30 1.13 0.80 1.40 N I * N 40.8 40.9 4.31 2.00 7.00 0.76 0.85 0.70 0.56 N I * N 40.9 40.10 2.55 5.00 -17.00 0.95 0.20 2.60 1.42 N I * N 40.10 40.11 1.78 301.00 18.00 0.00 0.60 0.80 1.10 N I * N 40.11 40.12 5.03 31.00 -3.00 0.20 0.55 1.22 0.77 N I * N 40.12 40.13 1.37 23.30 -4.30 0.70 0.40 1.00 0.70 N I * N 40.13 40.14 2.26 251.00 -13.00 0.49 0.84 0.67 1.28 N I * N 40.14 40.15 1.27 330.00 24.00 0.59 0.20 0.80 1.15 N I * N 40.15 40.16 2.10 45.00 7.00 0.42 0.57 0.72 1.22 N I * N 40.16 40.17 2.79 0.00 -4.00 0.58 0.49 1.30 0.75 N I * N 40.17 40.18 2.54 32.30 38.30 0.64 1.56 1.11 2.29 N I * N ;pt coté; 1.57 41.1 9.99 353.30 -11.00 0.59 0.47 1.05 0.00 N I * N 41.1 41.2 2.14 321.30 38.00 0.63 0.63 1.07 0.68 N I * N 41.2 41.3 2.26 246.00 -23.30 0.87 0.44 0.42 0.10 N I * N 41.3 41.4 2.62 311.00 -4.00 0.85 0.67 0.47 0.41 N I * N 41.4 41.5 4.25 286.00 6.30 1.74 0.00 0.90 0.95 N I * N 41.5 41.6 2.85 280.30 7.00 0.15 0.41 0.20 0.43 N I * N 41.6 41.7 3.20 246.00 18.00 0.63 0.47 0.20 0.46 N I * N 41.7 41.8 4.05 281.00 -9.00 0.20 0.80 0.30 0.50 N I * N 41.8 41.9 4.01 242.00 19.00 0.85 0.20 0.30 0.45 N I * N 41.9 41.10 1.77 265.00 -3.00 0.70 0.42 0.30 0.94 N I * N 41.10 41.11 7.52 212.30 21.00 2.19 2.40 4.14 0.63 N I * N 41.11 41.12 4.09 83.00 22.30 * * * * N I * N ;pt coté escalade du sable; 2.25 42.1 14.65 1.00 -22.00 0.42 2.79 6.77 0.64 N I * N 42.1 42.2 3.74 130.00 -34.00 1.60 1.40 3.00 0.50 N I * N 42.2 42.3 9.30 34.00 2.30 1.35 1.53 2.92 0.97 N I * N 42.3 42.4 7.07 34.00 32.00 1.50 3.00 10.00 3.00 N I * N ;point coté cheminée sous boue; 42.1 43.1 4.16 12.00 17.30 0.78 0.77 0.41 0.59 N I * N ;galerie inf vire; 43.1 43.2 4.03 29.00 -24.30 0.90 0.88 1.59 0.20 N I * N 43.2 43.3 4.14 78.00 20.00 0.20 0.86 0.79 1.46 N I * N 43.3 43.4 3.84 308.00 1.30 0.00 0.79 0.95 0.30 N I * N 43.4 43.5 1.80 345.00 -1.00 0.72 0.72 0.77 0.56 N I * N 43.5 43.6 3.49 285.00 -5.00 0.80 0.30 0.60 0.00 N I * N 43.6 43.7 3.50 346.00 4.00 0.20 0.62 0.90 0.50 N I * N 43.7 43.8 3.19 31.30 13.30 0.30 0.30 0.50 1.50 N I * N ;point coté gal inf vire; Param Deca Deg Clino Deg -1.0040 Dir,Dir,Dir Inc Std --/--/---- M 4.22 44.1 23.11 296.00 39.00 3.50 1.60 3.30 1.20 N I * N 44.1 44.2 17.90 210.00 24.30 0.30 2.80 1.15 1.80 N I * N 44.2 44.3 11.10 191.00 -1.30 1.75 1.95 1.28 0.67 N I * N 44.3 44.4 7.83 199.00 21.00 0.10 2.05 0.70 0.90 N I * N 44.4 44.5 9.80 240.00 25.00 0.40 1.56 1.40 0.70 N I * N 44.5 44.6 6.03 200.00 28.00 0.80 0.00 0.10 0.50 N I * N 44.6 44.7 1.70 248.00 44.00 0.20 0.20 0.00 0.40 N I * N ;fond moustiques; 44.5 45.1 3.68 65.00 38.00 0.00 0.20 0.00 4.00 N I * N ;TS moustiques; 4.22 46.1 9.34 177.00 13.00 0.80 1.70 1.84 0.84 N I * N ;bouclage annexe sable; 46.1 46.2 3.19 224.00 36.00 1.00 2.00 3.10 0.10 N I * N 46.2 46.3 2.56 354.00 44.00 2.00 0.30 1.50 1.80 N I * N 46.3 46.4 5.41 263.00 43.00 0.00 1.60 0.80 1.50 N I * N 46.4 46.5 2.42 303.00 13.00 * * * * N I * N 20.1 20.2 4.21 305.00 35.00 0.70 0.00 0.30 1.00 N I * N ;TS avant 3° siphon de sable; 20.2 20.3 4.20 297.30 -4.30 0.10 0.50 0.40 0.30 N I * N 20.3 20.4 2.92 290.00 -25.00 0.50 0.00 1.00 0.10 N I * N 20.4 20.5 0.86 317.00 8.00 0.00 0.50 0.70 0.20 N I * N 20.5 20.6 4.06 291.00 -32.00 0.20 0.40 0.40 1.50 N I * N ;pt coté TS; 20.6 20.7 1.96 87.00 -50.00 0.20 0.20 0.20 0.00 N I * N Param Deca Deg Clino Deg -1.0040 Dir,Dir,Dir Inc Std --/--/---- M 13.13 47.1 1.42 42.00 -6.00 1.30 0.40 2.50 1.30 N I * N ;escalade Vallée Blanche; 47.1 47.2 13.05 350.00 58.00 0.80 1.40 6.00 20.00 N I * N 47.2 47.3 8.75 357.00 57.00 0.90 0.00 3.00 1.50 N I * N 47.3 47.4 8.14 330.00 -51.00 1.60 1.80 8.00 35.00 N I * N 47.4 47.5 3.33 254.00 30.00 0.82 0.80 1.66 1.43 N I * N 47.5 47.6 1.61 298.00 19.00 0.30 0.60 1.00 1.00 N I * N 47.6 47.7 1.05 321.00 -33.00 0.30 0.60 1.00 1.00 N I * N 47.7 47.8 11.70 313.00 -34.30 0.20 0.50 3.00 1.50 N I * N 47.8 47.9 8.64 340.00 5.00 1.50 0.50 1.48 1.47 N I * N 47.9 47.10 7.25 347.00 11.00 0.50 0.96 7.00 1.82 N I * N 47.10 47.11 9.78 343.00 37.30 1.82 1.42 3.00 3.02 N I * N 47.11 47.12 2.50 320.30 27.30 1.80 1.33 2.00 1.26 N I * N 47.12 47.13 13.33 341.00 47.00 0.43 1.29 1.87 1.96 N I * N 47.13 47.14 1.98 347.30 16.00 0.44 1.07 1.30 0.67 N I * N 47.14 47.15 8.77 345.30 0.00 0.15 0.80 1.00 3.50 N I * N 47.15 47.16 7.43 345.00 -21.00 0.40 0.30 0.50 0.10 N I * N 47.16 47.17 2.93 335.00 -5.30 0.40 1.06 0.80 1.16 N I * N 47.17 47.18 2.18 3.00 -29.30 0.40 0.30 0.60 0.00 N I * N 47.18 47.19 2.90 350.00 0.00 0.10 0.20 0.40 0.00 N I * N 47.12 48.1 1.81 329.00 -15.00 0.30 0.40 12.00 10.00 N I * N 48.1 48.2 10.70 0.00 -90.00 0.20 0.40 10.00 11.00 N I * N Param Deca Deg Clino Deg -0.5622 Dir,Dir,Dir Inc Std --/--/---- M 7.2 49.1 8.75 297.00 -52.00 0.00 0.96 3.38 2.03 N I * N ;annexe galerie remontante; 49.1 49.2 3.54 320.00 -18.00 0.63 0.56 2.37 0.88 N I * N 49.2 49.3 6.97 305.00 -27.00 0.20 1.18 1.02 1.53 N I * N 49.3 49.4 5.21 0.00 -42.00 1.08 0.15 2.16 2.87 N I * N 49.4 49.5 3.34 313.00 -26.00 1.13 0.15 2.23 1.77 N I * N 49.5 49.6 6.49 261.00 -18.00 0.00 0.30 0.20 0.00 N I * N 49.1 50.1 7.17 212.00 0.00 0.00 0.80 1.00 1.00 N I * N 1.57 51.1 3.70 91.00 27.00 3.04 1.47 7.11 1.18 N I * N ;vers aval G Grosses Piques; 51.1 51.2 10.79 44.00 47.00 0.58 0.00 3.00 1.64 N I * N 51.2 51.3 3.58 5.00 12.00 0.30 0.60 3.00 1.27 N I * N 51.3 51.4 3.91 348.00 4.00 0.40 0.88 0.20 0.81 N I * N 51.4 51.5 3.62 30.00 17.00 0.30 0.52 0.95 1.57 N I * N 51.5 51.6 2.62 64.00 -50.00 0.50 0.85 6.80 1.53 N I * N 51.6 51.7 3.91 314.00 -50.00 0.70 0.00 1.15 1.52 N I * N 51.7 51.8 5.47 287.00 -29.00 2.12 0.46 1.00 1.63 N I * N 51.8 51.9 4.07 206.00 -30.00 0.75 2.22 1.19 2.09 N I * N 51.9 51.10 2.56 286.00 -28.00 1.15 0.00 0.70 1.09 N I * N 51.10 51.11 2.66 230.00 -33.00 0.50 1.20 0.60 4.00 N I * N 51.11 51.12 1.99 124.00 -66.00 0.40 1.40 2.50 2.80 N I * N 51.12 51.13 5.23 311.00 -36.00 0.59 0.43 0.88 1.33 N I * N 51.13 51.14 2.20 214.00 -52.00 0.00 0.30 1.50 2.00 N I * N 51.14 51.15 2.48 206.00 -15.00 0.90 0.10 1.00 4.00 N I * N 51.15 51.16 3.92 114.00 -67.00 1.05 0.99 6.80 0.82 N I * N 51.16 51.17 2.11 203.00 -33.00 0.66 0.00 0.60 0.65 N I * N 51.17 51.18 0.99 189.00 6.00 0.10 0.30 1.00 0.66 N I * N 51.18 51.19 1.76 158.00 5.00 0.50 0.00 0.85 0.80 N I * N 51.19 51.20 2.58 236.00 -47.00 0.70 0.00 1.20 0.70 N I * N 51.20 51.21 4.95 227.00 0.00 0.00 0.10 0.50 0.20 N I * N ;fond aval annexe Grosses Piques; 51.1 52.1 10.13 36.00 -40.00 1.00 2.00 13.00 0.00 N I * N ;puits borgne; 51.12 53.1 1.80 171.00 20.00 0.00 0.20 1.00 1.00 N I * N 53.1 53.2 3.50 200.00 0.00 0.00 1.60 3.00 7.00 N I * N Param Deca Deg Clino Deg -0.5345 Dir,Dir,Dir Inc Std --/--/---- M 2.30 54.1 14.22 137.00 22.30 2.16 1.75 2.23 0.80 N I * N 54.1 54.2 4.63 163.30 27.00 1.83 0.97 2.13 1.50 N I * N 54.2 54.3 2.77 144.00 22.00 1.24 0.41 3.28 2.39 N I * N 54.3 54.4 1.86 109.00 -52.00 0.20 0.50 3.26 0.47 N I * N 54.4 54.5 16.53 179.00 -36.00 3.00 2.00 2.00 1.00 N I * N 54.2 55.1 2.56 99.00 51.00 1.50 1.40 1.20 1.51 N I * N 55.1 55.2 7.55 124.00 48.00 1.00 0.00 0.30 0.60 N I * N 55.2 55.3 2.90 132.00 33.30 0.30 0.86 0.46 0.44 N I * N 55.3 55.4 2.21 188.00 21.00 0.40 0.10 0.10 0.30 N I * N 55.4 55.5 2.61 135.00 28.00 0.20 0.67 0.30 0.20 N I * N 55.5 55.6 2.34 199.00 25.00 0.60 0.00 0.25 0.40 N I * N 55.6 55.7 4.64 153.00 23.00 0.60 0.60 0.54 0.74 N I * N 55.7 55.8 3.83 135.00 24.30 0.40 1.00 0.80 0.80 N I * N 55.8 55.9 2.04 165.00 31.00 0.70 0.90 3.00 1.40 N I * N 55.9 55.10 4.68 111.00 44.00 2.40 4.50 0.44 0.89 N I * N 55.10 55.11 5.50 143.00 34.00 1.47 1.50 1.86 0.00 N I * N 55.11 55.12 4.97 60.00 46.00 2.00 0.60 0.48 1.32 N I * N 55.12 55.13 2.39 19.00 7.30 1.13 1.28 1.09 0.49 N I * N 55.13 55.14 3.63 53.00 44.00 1.16 2.44 0.20 0.54 N I * N 55.14 55.15 1.71 60.00 24.00 0.60 0.83 0.30 0.50 N I * N 55.15 55.16 6.58 65.30 17.00 1.57 0.10 0.70 0.90 N I * N 55.16 55.17 2.24 45.30 3.00 0.84 0.65 0.80 0.40 N I * N 55.17 55.18 3.77 65.00 17.30 0.40 0.40 0.30 0.30 N I * N 55.18 55.19 1.75 112.00 -37.00 0.15 0.40 0.70 1.70 N I * N 55.9 56.1 4.00 180.00 27.00 0.10 0.10 1.00 0.00 N I * N 55.11 57.1 4.57 205.00 13.00 1.50 0.00 1.00 1.00 N I * N 55.15 58.1 2.62 83.00 -25.00 2.80 2.65 15.00 0.30 N I * N 58.1 58.2 21.00 15.00 85.00 0.00 0.50 0.00 21.00 N I * N Param Deca Deg Clino Deg -0.5249 Dir,Dir,Dir Inc Std --/--/---- M 2.14 59.1 2.17 24.00 -14.00 0.90 0.30 0.70 0.70 N I * N 59.1 59.2 2.58 357.00 -10.00 0.40 0.66 3.30 0.70 N I * N 59.2 59.3 3.37 55.30 -2.00 0.20 0.40 0.50 0.10 N I * N 59.3 59.4 3.05 180.00 15.00 1.14 0.40 5.50 1.40 N I * N 59.3 60.1 2.90 17.00 5.00 0.10 0.30 0.30 0.10 N I * N 59.2 61.1 2.64 257.00 2.00 1.20 0.00 0.60 0.50 N I * N 61.1 61.2 3.33 129.00 5.00 0.30 0.90 0.70 0.70 N I * N 11.13 11.140 2.39 109.00 20.00 2.40 0.00 3.34 1.50 N I * N 11.140 11.150 7.15 45.00 43.00 0.30 0.30 1.70 6.00 N I * N 11.150 11.160 4.09 111.00 11.00 0.20 1.18 1.40 4.00 N I * N 11.160 11.170 3.26 139.00 -15.00 1.90 0.55 2.10 0.90 N I * N 11.170 11.180 3.57 22.00 -4.00 0.00 1.50 0.70 0.70 N I * N 2.24 62.1 1.57 246.00 -2.00 * * * * N I * N 62.1 62.2 4.47 304.00 -49.00 * * * * N I * N 62.2 62.3 3.34 235.00 -30.00 0.20 1.20 1.50 1.60 N I * N 62.3 62.4 2.26 12.30 -58.00 0.85 0.60 1.40 0.70 N I * N 62.4 62.5 5.12 317.00 -65.00 0.40 1.04 1.70 0.70 N I * N 62.5 62.6 5.96 5.00 -2.00 0.30 0.30 3.00 2.50 N I * N 62.6 62.7 5.49 31.00 46.00 0.10 0.80 0.40 1.50 N I * N 62.7 62.8 3.12 14.00 6.00 0.50 0.70 0.90 0.90 N I * N 62.8 62.9 2.95 30.00 32.00 0.80 0.70 1.50 3.30 N I * N 62.9 62.10 3.53 124.00 40.00 2.00 1.40 1.00 0.45 N I * N 62.10 62.11 6.21 144.00 17.00 * * * * N I * N 62.7 63.1 1.47 111.00 -34.00 1.10 0.60 0.10 1.00 N I * N 63.1 63.2 3.93 61.00 13.00 0.50 0.20 0.60 1.00 N I * N 63.2 63.3 1.94 338.00 14.00 0.30 1.10 0.20 1.20 N I * N 63.3 63.4 4.00 36.00 8.00 0.00 0.20 0.30 0.20 N I * N 62.8 64.1 3.89 6.00 2.00 0.80 0.10 1.00 0.30 N I * N 64.1 64.2 3.16 340.00 -18.00 0.80 0.10 1.10 6.00 N I * N 64.2 64.3 4.23 238.00 -57.00 0.00 0.90 3.70 2.40 N I * N 64.3 64.4 2.60 278.00 -17.00 0.66 0.00 2.60 1.63 N I * N 64.4 64.5 1.99 201.00 -18.00 0.20 1.00 2.40 1.14 N I * N 64.5 64.6 2.61 235.00 -14.00 0.40 0.30 1.40 0.90 N I * N 64.6 64.7 4.23 237.00 -7.00 0.30 0.20 0.20 0.40 N I * N 64.7 64.8 3.77 238.00 32.00 0.10 0.50 0.30 0.50 N I * N 64.8 64.9 4.07 252.00 -7.00 0.30 0.20 0.00 0.50 N I * N 64.9 64.10 1.73 264.00 5.00 0.40 0.00 0.30 0.80 N I * N 64.10 64.11 2.63 256.00 -12.00 0.10 0.40 0.40 1.30 N I * N 64.11 64.12 2.90 267.00 -28.00 0.50 0.00 0.20 1.40 N I * N 64.12 64.13 2.23 228.00 -34.00 0.00 0.50 0.60 0.30 N I * N 2.42 65.1 11.44 183.00 3.30 * * * * N I * N 65.1 65.2 21.78 226.30 -20.00 1.30 1.60 1.30 0.70 N I * N ;départ annexe boyau faille; 65.2 65.3 4.06 318.00 -31.00 2.00 2.14 1.00 0.30 N I * N 65.3 65.4 4.40 9.00 -12.00 0.40 2.00 1.20 0.65 N I * N 65.4 65.5 7.87 27.00 22.00 0.70 1.70 0.70 1.20 N I * N 65.5 66.1 6.30 138.00 20.00 0.10 0.30 0.00 0.30 N I * N 65.5 65.6 6.25 329.00 -7.00 0.90 1.80 0.55 0.50 N I * N 65.6 65.7 5.95 34.00 13.00 0.40 1.40 1.10 0.10 N I * N 65.7 65.8 2.58 52.00 22.00 0.80 0.40 0.60 0.60 N I * N 65.8 65.9 4.10 11.00 -13.00 1.10 1.82 0.50 0.10 N I * N 65.9 65.10 3.29 57.00 4.00 0.60 0.40 0.40 0.20 N I * N 65.10 65.11 5.77 23.00 -5.00 0.77 0.63 0.20 0.20 N I * N 65.11 65.12 2.40 6.00 -14.00 0.60 0.50 0.55 0.20 N I * N 65.12 65.13 4.88 42.00 1.00 0.66 0.85 0.70 1.50 N I * N 65.13 65.14 2.63 127.00 -45.00 * * * * N I * N ;jonction galerie puits broyé; 65.9 67.1 0.72 287.00 0.00 0.30 0.40 0.00 0.50 N I * N 67.1 67.2 3.44 5.00 -13.00 0.30 0.60 0.60 0.50 N I * N 67.2 67.3 3.95 33.00 -6.00 0.40 2.00 0.80 0.20 N I * N 67.3 67.4 3.66 284.00 -31.00 0.62 0.20 0.30 1.00 N I * N 67.4 67.5 2.79 202.00 5.00 0.70 0.00 0.50 0.50 N I * N 67.5 67.6 8.96 207.00 -34.00 0.30 0.50 0.30 3.25 N I * N 67.6 67.7 1.48 0.00 -72.00 * * * * N I * N 67.7 67.8 1.91 287.00 2.00 * * * * N I * N ;jonction point 27.35; 2.46 68.1 4.85 267.00 -32.00 0.10 0.70 0.80 0.40 N I * N Param Deca Deg Clino Deg -0.5249 Dir,Dir,Dir Inc Std --/--/---- M 68.1 68.2 1.87 310.00 0.00 0.70 0.20 0.40 3.00 N I * N ;aval de l'AMONT RIU FRET; 68.2 68.3 2.58 120.00 -44.00 0.00 0.80 1.00 0.90 N I * N 68.3 68.4 3.72 164.00 8.00 0.20 0.70 1.00 1.30 N I * N 68.4 68.5 3.38 190.00 0.00 0.60 0.10 1.00 1.20 N I * N 68.5 68.6 5.06 220.00 0.00 0.00 0.80 1.00 1.00 N I * N 68.6 68.7 3.68 191.00 -27.00 0.00 0.60 0.70 0.00 N I * N 68.2 69.1 4.42 328.00 -4.00 1.00 0.10 1.20 2.00 N I * N 69.1 69.2 2.56 330.00 -43.00 0.50 0.40 2.50 1.00 N I * N 69.2 69.3 6.46 351.00 -8.00 1.10 0.30 1.60 0.10 N I * N 69.3 69.4 2.69 332.00 5.00 0.20 0.70 1.00 0.50 N I * N 69.4 69.5 3.35 337.00 0.00 0.10 0.70 0.80 0.40 N I * N 69.5 69.6 4.37 30.00 0.00 0.80 0.40 0.70 0.60 N I * N 69.6 69.7 8.02 351.00 -5.00 0.70 1.30 1.00 0.10 N I * N 69.7 69.8 6.38 347.00 4.00 0.20 0.50 0.60 0.30 N I * N 69.8 69.9 7.24 346.00 -2.00 1.20 0.00 0.80 0.20 N I * N 69.9 69.10 3.41 347.00 0.00 0.40 0.60 1.20 0.40 N I * N 69.10 69.11 3.68 26.00 -4.00 0.40 0.40 1.20 0.00 N I * N 69.11 69.12 5.04 33.00 0.00 0.90 0.40 0.80 0.00 N I * N 69.12 69.13 1.14 14.00 45.00 0.80 0.40 1.50 1.00 N I * N 69.13 69.14 3.65 11.00 -8.00 0.10 0.40 0.50 0.00 N I * N ;amont amont riu fret; Param Deca Deg Clino Deg -0.5249 Dir,Dir,Dir Inc Std --/--/---- M 69.13 70.1 2.84 64.00 60.00 0.80 0.30 1.00 1.00 N I * N 70.1 70.2 5.25 208.00 -15.00 1.60 0.20 1.30 0.20 N I * N 70.2 70.3 4.11 195.00 26.00 0.30 1.20 0.40 1.20 N I * N 70.3 70.4 4.04 189.00 0.00 0.20 0.40 1.00 0.00 N I * N 64.13 64.14 1.47 259.00 17.00 0.50 0.00 0.50 0.60 N I * N 64.14 64.15 1.28 229.00 4.00 0.30 0.10 0.30 0.70 N I * N 64.15 64.16 2.33 258.00 -15.00 0.70 0.10 0.70 0.15 N I * N 64.16 64.17 1.40 186.00 35.00 0.00 0.40 0.50 0.50 N I * N 64.17 64.18 1.74 245.00 32.00 0.60 0.00 3.70 0.90 N I * N 64.18 64.19 3.58 135.00 78.00 0.60 0.60 3.00 4.00 N I * N 64.19 64.20 2.87 267.00 75.00 0.40 0.30 0.30 3.00 N I * N 64.20 64.21 1.67 266.00 18.00 0.00 0.35 1.50 0.70 N I * N 64.21 64.22 3.32 310.00 37.00 0.10 0.20 0.30 0.10 N I * N 2.28 71.1 13.74 27.00 23.00 0.00 0.60 2.10 1.30 N I * N 71.1 71.2 4.62 7.00 -19.00 0.40 1.15 1.10 0.80 N I * N 71.2 71.3 3.22 14.00 8.00 1.10 0.35 0.60 1.00 N I * N 71.3 71.4 4.68 6.00 -8.00 1.10 0.90 1.20 0.70 N I * N 71.4 71.5 2.85 237.00 -21.00 1.20 0.40 2.30 1.20 N I * N 71.5 71.6 2.53 329.00 -43.00 0.20 1.05 1.60 0.60 N I * N 71.6 71.7 3.49 8.30 6.00 0.00 0.75 3.40 1.40 N I * N 71.7 71.8 3.03 60.00 -45.00 * * * * N I * N ;jonction point 27.5; Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 2.137 72.1 2.43 297.00 -15.30 0.48 4.20 1.00 0.90 N I * N 72.1 72.2 2.24 66.00 -40.00 0.30 0.30 0.00 0.50 N I * N 72.2 72.3 1.49 19.00 -25.30 0.42 0.42 0.30 0.60 N I * N 72.3 72.4 2.87 9.00 -19.00 0.84 0.20 0.00 1.27 N I * N 72.4 72.5 2.91 59.00 26.00 0.35 1.05 0.20 1.42 N I * N 72.5 72.6 3.53 41.00 -22.00 0.53 0.64 1.40 0.00 N I * N 72.6 72.7 3.03 47.00 41.00 0.82 0.00 0.20 0.87 N I * N 72.7 72.8 4.63 38.00 -32.00 1.50 0.50 0.25 0.72 N I * N 72.8 72.8a 8.00 70.00 0.00 0.80 0.40 0.80 0.50 N I * N 72.8 72.9 0.98 316.00 -61.00 1.00 1.00 0.60 0.00 N I * N 72.9 72.10 4.00 354.00 7.00 1.30 0.40 0.30 0.80 N I * N 72.10 72.11 2.98 323.00 13.00 0.20 1.40 0.40 1.04 N I * N 72.11 72.12 4.62 29.00 -50.00 1.65 0.47 1.58 0.05 N I * N Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 72.12 72.13 4.41 342.00 0.00 0.50 1.00 0.20 0.00 N I * N ;siphon; Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 72.4 73.1 3.91 250.00 -26.00 0.74 0.10 0.90 0.85 N I * N 73.1 73.2 4.04 169.00 -3.00 0.15 1.50 1.00 1.15 N I * N Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 73.2 73.3 3.60 252.00 -9.00 0.50 0.55 1.20 0.70 N I * N 73.3 73.4 3.15 290.00 -2.00 0.75 0.60 1.80 1.60 N I * N 73.4 73.5 4.96 289.00 -9.00 0.68 0.80 1.00 1.20 N I * N 73.5 73.6 2.77 231.00 8.00 0.20 0.50 0.47 1.30 N I * N 73.6 73.7 3.02 275.00 -17.00 0.00 0.40 1.00 0.60 N I * N Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 17.2 17.3 0.77 16.00 6.00 0.65 0.20 0.30 0.70 N I * N 17.3 17.4 1.84 291.00 10.00 0.50 0.30 0.30 0.20 N I * N 17.4 17.5 1.51 323.00 34.00 0.40 0.50 0.20 0.40 N I * N 17.5 17.6 1.94 291.00 30.00 0.20 2.30 0.60 0.30 N I * N 17.6 17.7 2.37 10.00 28.00 2.10 0.30 0.80 0.40 N I * N 17.7 17.8 3.78 281.00 3.00 1.30 0.40 0.80 0.50 N I * N 17.8 17.9 12.51 253.00 -51.00 2.60 1.00 1.10 0.50 N I * N 17.9 17.10 3.97 193.00 -43.00 * * * * N I * N ;jonction point 2.125; 2.125 75.1 4.61 268.00 -5.00 * * * * N I * N Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 75.1 75.2 2.96 35.00 -38.00 0.15 0.42 1.95 6.00 N I * N 75.2 75.3 4.23 241.00 -58.00 0.44 0.30 1.44 2.00 N I * N 75.3 75.4 2.10 249.00 11.00 0.30 0.50 2.20 3.00 N I * N 75.4 75.5 2.37 297.00 23.00 0.20 0.50 0.50 2.30 N I * N 75.5 75.6 2.07 10.00 2.00 0.90 0.30 0.40 1.00 N I * N 75.6 75.7 3.22 314.00 7.00 0.74 0.30 0.80 1.40 N I * N 75.3 76.1 1.94 68.00 -22.00 0.10 0.50 0.40 1.00 N I * N 76.1 76.2 2.30 115.00 13.00 0.80 0.50 0.50 1.00 N I * N 76.2 76.3 3.17 39.00 6.00 0.60 1.00 0.50 1.40 N I * N 76.3 76.4 2.79 82.00 -7.00 0.90 0.70 0.80 0.70 N I * N 76.4 76.5 4.18 135.00 -2.00 1.70 1.00 0.80 0.50 N I * N 76.5 76.6 2.80 115.00 24.00 0.20 0.40 0.40 1.50 N I * N 76.6 76.7 2.90 154.00 -8.00 0.70 0.00 0.20 0.80 N I * N 76.7 76.8 6.20 119.00 -7.00 0.30 1.00 0.30 0.00 N I * N ;voute mouillante; Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 2.117 77.1 5.91 134.00 -38.00 * * * * N I * N 77.1 77.2 2.11 16.00 1.00 0.70 0.40 1.40 2.40 N I * N ;point coté départ méandre actif; 2.115 78.1 6.09 160.00 2.00 0.50 0.30 1.00 1.20 N I * N 78.1 78.2 4.05 115.00 6.30 0.40 0.50 0.60 1.60 N I * N 78.2 78.3 3.29 137.00 -18.00 0.00 0.30 0.30 0.40 N I * N 78.3 78.4 6.70 163.00 0.00 0.80 0.00 0.70 0.40 N I * N 77.2 77.3 5.37 0.00 -19.00 1.50 0.70 1.70 0.70 N I * N 77.3 77.4 3.83 100.00 10.00 0.40 0.96 0.50 1.00 N I * N 77.4 77.5 2.60 168.00 11.00 0.40 0.30 0.30 0.90 N I * N Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 77.5 77.6 1.84 150.00 -5.00 0.40 0.60 0.60 1.50 N I * N 77.6 77.7 4.13 131.00 2.00 0.70 1.80 0.90 1.30 N I * N 77.7 77.8 3.33 169.00 17.00 0.20 3.50 0.40 2.60 N I * N 77.8 77.9 3.28 145.00 -39.00 0.50 0.40 1.20 0.60 N I * N 77.9 77.10 2.22 111.00 25.00 0.30 0.40 0.50 1.60 N I * N 77.10 77.11 1.98 139.00 -19.00 0.75 0.00 0.90 1.10 N I * N 77.11 77.12 1.50 141.00 0.00 0.10 0.50 0.80 0.90 N I * N 77.12 77.13 2.47 195.00 3.30 0.40 0.30 0.50 1.00 N I * N 77.13 77.14 2.04 176.00 39.00 0.80 0.60 2.00 3.00 N I * N 77.14 77.15 5.19 160.00 -6.30 1.50 0.50 0.20 1.90 N I * N 77.15 77.16 1.80 149.00 -17.00 0.80 1.20 0.40 1.30 N I * N 77.16 77.17 3.05 87.00 -1.00 0.30 1.80 0.50 1.50 N I * N 77.17 77.18 5.09 171.00 3.00 0.60 0.70 0.20 1.20 N I * N 77.18 77.19 6.74 169.00 -5.00 1.30 0.20 0.70 1.00 N I * N 77.19 77.20 3.00 88.00 -13.00 0.70 1.00 0.80 0.00 N I * N 77.20 77.21 4.77 94.00 8.00 0.30 1.50 1.30 0.80 N I * N 77.21 77.22 2.54 122.00 51.00 0.50 0.20 3.00 3.50 N I * N 77.22 77.23 1.77 141.00 67.00 0.50 0.30 6.00 3.00 N I * N Param Deca Deg Clino Deg -0.5025 Dir,Dir,Dir Inc Std --/--/---- M 16.1 16.2 10.17 172.00 34.00 0.00 1.30 0.50 1.60 N I * N 16.2 16.3 5.49 220.00 27.00 0.10 0.30 0.30 0.00 N I * N 16.1 79.1 3.80 21.00 28.00 0.30 0.20 2.00 0.00 N I * N 2.115 80.1 6.53 275.00 -6.00 * * * * N I * N 80.1 80.2 2.67 244.00 -2.00 * * * * N I * N 80.2 80.3 4.70 231.00 0.00 * * * * N I * N 80.3 80.4 5.82 285.00 3.00 * * * * N I * N 80.4 80.5 2.77 295.00 10.00 * * * * N I * N 80.5 80.6 1.99 332.00 18.00 * * * * N I * N ;bas cheminée; 80.6 80.7 2.81 248.00 26.00 * * * * N I * N 80.7 80.8 5.81 318.00 19.00 * * * * N I * N 80.8 80.9 1.44 286.00 -14.00 * * * * N I * N 80.9 80.10 1.95 248.00 25.00 0.00 1.00 4.00 5.00 N I * N 80.10 80.11 3.52 351.00 32.00 2.50 0.40 3.00 2.00 N I * N 80.11 80.12 8.20 163.00 53.00 1.00 0.00 1.40 1.40 N I * N 80.12 80.13 1.04 162.00 29.00 1.30 0.00 0.00 2.00 N I * N 80.13 80.14 6.60 264.00 73.00 0.20 1.70 1.30 2.00 N I * N 80.14 80.15 2.46 299.00 18.00 1.30 0.90 1.60 1.40 N I * N 80.15 80.16 8.56 277.00 -2.00 1.20 0.60 1.50 1.00 N I * N 80.16 80.17 5.25 248.00 -17.00 0.90 1.90 1.60 0.10 N I * N 80.17 80.18 7.49 230.00 7.00 0.70 1.40 0.55 0.20 N I * N 80.18 80.19 6.94 223.00 5.00 1.00 0.60 0.00 0.80 N I * N 80.19 80.20 3.20 223.00 -16.00 1.30 1.00 0.80 0.20 N I * N 80.20 80.21 5.26 228.00 20.00 1.50 0.00 1.70 1.50 N I * N 80.21 80.22 2.90 210.00 9.00 0.50 1.50 0.20 0.70 N I * N 80.22 80.23 6.50 232.00 19.00 1.00 0.30 0.80 4.00 N I * N 80.23 80.24 5.79 229.00 -10.00 0.60 0.60 0.50 0.80 N I * N 80.24 80.25 1.86 222.00 -34.00 0.50 1.10 1.80 0.05 N I * N 80.25 80.26 4.28 247.00 -40.00 0.30 0.80 0.60 0.70 N I * N 80.26 80.27 1.40 224.00 3.00 0.20 0.30 0.00 0.50 N I * N 80.27 80.28 2.33 322.00 0.00 0.30 0.40 1.00 0.60 N I * N 80.12 81.1 0.69 330.00 23.00 0.40 0.90 1.50 1.70 N I * N 81.1 81.2 5.43 296.00 12.00 0.40 0.40 0.20 0.30 N I * N 81.2 81.3 0.88 310.00 6.00 0.40 0.10 1.00 0.30 N I * N 81.3 81.4 4.49 256.00 9.00 0.90 1.10 0.80 0.80 N I * N 81.4 81.5 5.51 285.00 11.00 0.20 0.90 0.60 0.90 N I * N 81.5 81.6 2.21 283.00 -14.00 1.20 0.45 0.00 0.80 N I * N 81.6 81.7 6.61 225.00 10.00 0.30 0.30 1.20 0.90 N I * N 81.7 81.8 3.30 231.00 3.00 0.40 2.00 0.70 0.80 N I * N 81.8 81.9 1.55 354.00 3.00 0.40 1.20 0.50 0.70 N I * N 81.5 82.1 3.88 30.00 -55.00 0.20 0.60 0.50 0.30 N I * N 82.1 82.2 4.57 22.00 -30.00 0.00 0.40 0.20 0.30 N I * N 80.25 83.1 5.90 308.00 36.00 0.60 0.20 1.20 1.00 N I * N 83.1 83.2 2.97 287.00 52.00 0.70 0.40 1.00 2.00 N I * N 80.26 84.1 3.24 20.00 10.00 0.70 0.50 0.00 0.50 N I * N 84.1 84.2 5.44 53.00 7.00 0.00 0.90 0.80 0.60 N I * N 83.2 83.3 5.36 247.00 40.00 0.00 0.40 1.00 1.00 N I * N 83.3 83.4 4.00 272.00 37.00 0.20 0.00 0.60 0.00 N I * N 83.1 85.1 3.07 225.00 -21.00 0.30 0.70 1.20 0.00 N I * N 85.1 85.2 1.54 220.00 35.00 0.20 0.40 0.30 0.70 N I * N 85.2 85.3 3.22 239.00 21.00 0.40 0.00 0.50 0.00 N I * N 85.3 85.4 2.32 224.00 -29.00 0.00 0.30 0.20 0.90 N I * N 85.4 85.5 4.23 236.00 0.00 0.30 0.00 0.00 0.80 N I * N 81.9 81.10 3.95 240.00 0.00 0.30 0.20 0.50 0.20 N I * N 55.19 55.20 1.28 133.00 -40.00 1.80 0.00 3.00 3.60 N I * N 55.20 55.21 7.60 59.00 -59.00 0.00 1.10 2.70 12.00 N I * N 55.21 55.22 13.35 87.00 -76.00 1.40 1.75 13.00 1.50 N I * N 55.22 55.23 3.82 7.00 -48.00 0.50 0.00 1.00 3.70 N I * N 55.23 55.24 3.48 310.00 -52.00 0.00 0.30 1.80 15.00 N I * N 55.24 55.25 4.20 307.00 -83.00 2.20 2.40 3.50 9.00 N I * N 55.25 55.26 9.50 250.00 -86.00 0.60 0.80 3.30 7.70 N I * N 55.26 55.27 7.20 189.00 -81.00 1.10 0.30 10.00 0.70 N I * N 55.27 55.28 2.70 357.00 -17.00 0.10 0.00 0.20 0.00 N I * N ;fond puits actif boue; 55.20 86.1 3.64 154.00 67.00 0.20 0.30 1.00 1.00 N I * N 86.1 86.2 2.00 163.00 46.00 0.60 0.30 7.00 1.50 N I * N ;point coté départ petit actif; 86.2 86.3 2.52 191.00 11.00 0.00 0.30 0.00 0.40 N I * N 86.2 87.1 2.19 124.00 58.00 1.00 0.40 8.00 1.50 N I * N 87.1 87.2 3.30 144.00 0.00 1.00 0.00 7.00 1.40 N I * N 87.2 87.3 9.20 342.00 75.00 0.00 0.70 0.00 10.00 N I * N 86.2 88.1 3.79 335.00 16.00 1.10 1.50 6.00 2.00 N I * N 88.1 88.2 4.30 326.00 -10.00 0.40 0.50 0.30 0.50 N I * N 88.1 89.1 3.34 58.00 14.00 0.00 1.25 2.10 1.30 N I * N 89.1 89.2 2.03 117.00 0.00 0.40 0.20 0.10 0.40 N I * N 89.2 89.3 1.63 104.00 14.00 1.00 0.60 0.40 0.20 N I * N 89.3 89.4 7.62 54.00 0.00 1.00 0.50 0.60 0.40 N I * N 89.4 89.5 3.52 44.00 -4.00 1.25 0.00 0.50 0.70 N I * N ;point coté ts boue; Param Deca Degd Clino Degd -0.4309 Dir,Dir,Dir Inc Std --/--/---- M 89.5 89.6 3.17 25.00 -2.00 0.50 0.70 0.60 0.20 N I * N 89.6 89.7 1.75 91.00 42.00 0.00 0.70 0.30 0.50 N I * N 89.7 89.8 0.65 103.00 -8.00 0.70 0.00 0.40 0.30 N I * N 89.8 89.9 2.48 29.00 -12.00 0.30 0.70 0.30 0.20 N I * N 89.9 89.10 2.72 51.00 20.00 0.40 0.80 0.20 0.30 N I * N 89.10 89.11 2.47 41.00 34.00 0.70 0.30 0.50 0.20 N I * N 89.11 89.12 3.46 32.00 53.00 0.00 0.80 0.30 0.60 N I * N 89.12 89.13 5.80 30.00 52.00 0.00 0.40 0.60 1.00 N I * N 89.13 89.14 6.18 78.00 45.00 0.70 1.00 1.20 0.30 N I * N 89.14 89.15 2.30 92.00 35.00 1.40 0.00 0.60 0.70 N I * N ;àpoint coté P 20; 89.15 89.16 9.68 33.00 0.00 0.80 0.20 2.30 2.00 N I * N 89.16 89.17 6.02 43.00 -30.00 1.60 0.40 0.90 1.20 N I * N 89.17 89.18 3.52 48.00 -16.00 1.20 0.90 2.40 0.40 N I * N ;point coté bas escalade; 89.18 89.19 15.51 118.00 59.00 0.00 1.70 4.00 0.70 N I * N 89.19 89.20 1.88 103.00 30.00 1.60 0.00 6.00 1.60 N I * N 89.20 89.21 8.43 43.00 72.00 0.30 0.50 0.00 0.80 N I * N 89.18 90.1 9.20 80.00 20.00 0.20 0.30 3.00 0.00 N I * N 89.18 91.1 2.55 68.00 -2.00 1.65 2.13 2.30 0.50 N I * N 91.1 91.2 4.70 315.00 -40.00 2.11 2.14 1.10 1.20 N I * N 91.2 91.3 5.93 346.00 -25.00 0.30 0.80 0.10 0.60 N I * N 91.3 91.4 5.58 27.00 -33.00 0.58 0.70 0.60 0.00 N I * N 91.4 91.5 4.50 353.00 -25.00 0.00 0.50 0.30 0.00 N I * N 89.18 92.1 3.68 115.00 37.00 0.90 1.30 6.00 0.00 N I * N 92.1 92.2 1.88 166.00 18.00 0.00 2.00 8.00 8.00 N I * N 92.2 92.3 8.00 28.00 -60.00 0.00 0.70 2.00 0.00 N I * N [Configuration 5.09] Visual Topo=0,1,-1,-1,-1,-1,85,197,1525,956 Options=1,1 Calcul=0,1,-1,-1,-1,-1,26,26,1290,384 Options=11,2,0,1,0 ExportDxf=0,100,1415,-16261,0,1,6,7,4,4,3,3,2,7,9,9 ExportKml=0 ExportShp=0,0,0 Colonnes=8.00,8.00,8.00,8.00,8.00,8.00,8.00,8.00,8.00,8.00,8.00,2.00,2.00,2.00,2.00,4.00,0.38,8.00,8.00,8.00,8.00,8.00,0.38,0.00,0.00 Plan=0,1,-1,-1,-1,-1,52,52,1316,410 Options=35841,1.00,25,0,0,0,0,0,1,0,1